The invention relates to a construction method of a complex glass-modeling
perforated metal plate double-layer
curtain wall, in particular to a steel structure fixing aluminum
alloy keel efficient installation structure, a
keel and an aluminum
alloy curtain wall are fixedly connected through a fixing screw rod, efficient installation is conveniently achieved, the aluminum
alloy curtain wall is convenient and fast to install and position, operation is easy, and time used for installation is short. In the
metal plate installation technology, an embedded fixing plate is connected with a sealing protection plate and a
metal steel plate, so that the connecting position of the
metal steel plate is prevented from being exposed to the outside, and the metal steel plate is prevented from being corroded; the
welding technology of the lower round steel and the steel structure is achieved by forming the groove, operation is easy and convenient, and installation efficiency is high; the long angle steel is welded to one side of the steel structure girder, the top end of the long angle steel is connected with the short angle steel, an accurate
lofting and positioning structure is formed, carrying and construction operation are convenient, large-area
lofting is conducted firstly, then accurate positioning is conducted, and a sufficient working face is provided for follow-up installation.