Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

855results about How to "Adequate heat dissipation" patented technology

Power supply control apparatus

A power supply control apparatus for controlling a power supply unit including a battery and a load is provided. The power supply control apparatus includes a main relay and a ground relay, a pre-charge relay, an inrush current limiting resistor, a first relay control section, and a time measurement section. The main relay and the ground relay are connected between the battery and the load. The pre-charge relay is connected in parallel with one of the main relay and the ground relay. The inrush current limiting resistor is connected in series with the pre-charge relay, and limits an inrush current from the battery to the load. The first relay control section temporarily turns ON the pre-charge relay and turns ON the main relay and the ground relay upon receiving a power supply connection request from the outside, and turns OFF the main relay and the ground relay upon receiving a power supply interruption request from the outside. The time measurement section chooses a time point in the period from when the pre-charge relay is turned ON to when it is turned OFF, and measures the elapsed time from the chosen time point. Before the elapsed time measured by the time measurement section reaches a predetermined reference period, the first relay control section does not turn OFF the main relay and the ground relay, but maintains the relays ON, even when receiving the power supply interruption request.
Owner:TOYOTA IND CORP

Anti-collision electric power cabinet with height adjustment function

The invention discloses an anti-collision electric power cabinet with a height adjustment function. The anti-collision electric power cabinet comprises a base, a cabinet body, screw thread rods, a first motor, belt wheels, a belt, sleeves, protection plates, a spring, a cylinder body, a piston rod and a safety airbag. By virtue of setting of the first motor, the screw thread rods, the belt wheelsand the belt, the height of the cabinet can be adjusted, and damage to the electrical power equipment in the cabinet body caused by large-area ground water accumulation can be avoided; by virtue of matching of a second motor, a circular ring, a movable rod and a fan, the fan can be driven to move left and right, so that the electric power equipment can be subjected to heat dissipation by the fan completely and uniformly in a mobile manner with a good effect, so that heat dissipation efficiency is improved; and by virtue of setting of the protection plates, the piston rod, the piston, the cylinder body and the safety airbag, the safety airbag is inflated with air when the protection plates on the two sides of the cabinet body suffer from collision, so that the electric power equipment in the cabinet body is further buffered and protected, and damage to the electrical power equipment in the cabinet body can be avoided.
Owner:储昭汉

Integrated test system for simulated master station for intelligent substation

The invention relates to the technical field of substations, in particular to an integrated test system for a simulated master station for an intelligent substation. The integrated test system comprises simulated master station testers, wherein the simulated master station tester A is connected with an A-zone data communication cabinet through a router and a switch; the simulated master station tester B is connected with a B-zone data communication cabinet through the router and the switch; the A-zone data communication cabinet is in communication connection with a measuring and control device and a local monitor respectively; the B-zone data communication cabinet is also connected with a comprehensive application server of an alarm direct graphic gateway machine; the A-zone data communication cabinet and the B-zone data communication cabinet are connected with a dispatching data screen; and the dispatching data screen transmits data to a regulation and control center. Due to use of an integrated tester for the simulated master station for the intelligent substation, information check work which needs to repeat twice in the past is changed into once; the closing frequency of primary equipment is reduced; the damage to the equipment is effectively reduced; and the service lifetime of the equipment is prolonged.
Owner:STATE GRID SHANDONG ELECTRIC POWER +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products