A technology of intelligent substation and simulating master station, applied in the field of substation, can solve the problems of tight reserved construction period, fatigue of staff, equipment damage, etc., and achieve the effect of sufficient heat dissipation, reducing the number of pulling and closing times, and prolonging the service life.

Inactive Publication Date: 2016-05-25
STATE GRID SHANDONG ELECTRIC POWER +2
View PDF3 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Problems in the current calibration method: the traditional telecontrol information calibration method requires at least two signal calibrations, and the signal involving switch displacement needs to be pulled repeatedly, causing equipment damage once
And under this method, the telecontrol information verification can only be carried out after the communication network between the substation and the main dispatching station is unblocked, and the channel can only be opened after the construction of the line outside the station is completed. At this time, it is close to the power transmission time. The working period is tight, and the staff need to work overtime to complete
In addition, this method requires the cooperation between the substation end and the main dispatching station to check each control information one by one. The two parties need to be in close contact and work together. Continuous calls not only cause waste of resources, but also cause staff fatigue.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated test system for simulated master station for intelligent substation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] Such as figure 1 As shown, the intelligent substation simulation master station comprehensive test system of the present invention includes a simulated master station tester, and the simulated master station tester A is connected to the data communication cabinet in area A through a router and a switch, and the simulated master station tester B is connected through a router And the switch is connected with the data communication cabinet in area B, the data communication cabinet in area A is equipped with telecontrol device A, telecontrol device B and a switch, and the data communication cabinet in area A communicates with the measurement and control device and the local monitoring machine respectively connection; the data communication cabinet in the B area is provided with a communication gateway machine and a switch, and the data communication cabinet in the B area is also connected with the comprehensive application server of the alarm direct transmission graphic gate...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of substations, in particular to an integrated test system for a simulated master station for an intelligent substation. The integrated test system comprises simulated master station testers, wherein the simulated master station tester A is connected with an A-zone data communication cabinet through a router and a switch; the simulated master station tester B is connected with a B-zone data communication cabinet through the router and the switch; the A-zone data communication cabinet is in communication connection with a measuring and control device and a local monitor respectively; the B-zone data communication cabinet is also connected with a comprehensive application server of an alarm direct graphic gateway machine; the A-zone data communication cabinet and the B-zone data communication cabinet are connected with a dispatching data screen; and the dispatching data screen transmits data to a regulation and control center. Due to use of an integrated tester for the simulated master station for the intelligent substation, information check work which needs to repeat twice in the past is changed into once; the closing frequency of primary equipment is reduced; the damage to the equipment is effectively reduced; and the service lifetime of the equipment is prolonged.

Description

technical field [0001] The invention relates to the technical field of substations, in particular to an intelligent substation simulation master station comprehensive test system. Background technique [0002] With the development of smart grid and the improvement of digital communication technology, the digital signals of smart substations are getting larger and larger. A 220 kV smart substation needs to communicate nearly three thousand (two thousand) signals. Telecontrol information check is the work that must be carried out before the substation is put into operation. It is used to check whether the information generated in the station can be sent to the dispatching master station correctly. The main verification objects are the information point number conversion of the telecontrol device and the information points of the databases of both parties. Is the name correct. [0003] The traditional telecontrol information verification method is as follows: (1) The local sub...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J13/00
CPCH02J13/0017Y02E60/00Y04S10/16
Inventor 隋石妍王磊高娟王伟王韬马卫国王健张洪华窦鹏飞刘道寰
Owner STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products