Gob-side retaining entry beforehand wall-caving roof-reinforcing method
A technology of gob entry retention and roof, which is applied in the direction of earthwork drilling, mining equipment, pillars/brackets, etc. It can solve the problems of adverse effects on the stability of gob entry retention, unreasonable support methods, and long suspension time of the roof, etc. Achieve the effect of maintaining the stability of the roadway, avoiding untimely construction, and enhancing the integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0024] 1. Model of support material
[0025] Anchor: High-strength anchor rod, the pallet is an I-beam pallet with a length of 800mm.
[0026] Anchor mesh: 2000×1600mm diamond-shaped metal mesh.
[0027] Anchor cable: Φ17.8mm×6500mm anchor cable.
[0028] Steel belt: Ordinary W steel belt for mining.
[0029] 2. Support parameters
[0030] The row spacing between the anchor rods is 0.8m, and they are driven straight up; the anchor cables are driven every 2.4m along the direction of the roadway, and the distance from the side wall of the gob-side roadway is 0.8m, and they are driven straight up.
[0031] 3. Construction process
[0032] Blasting coal is used to open the side, and floating coal is handled manually. Blasting shall be carried out in strict accordance with the requirements of the regulations. After the blasting, the floating coal shall be loaded into the conveyor or transported away on the belt in time. Arrange single hydraulic props at the opening position...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
