Paralleling reactor operation overvoltage managing circuit and managing method of paralleling reactor operation overvoltage managing circuit
A technology for operating overvoltage and reactors, which is applied in the direction of circuit devices, AC network circuits, electrical components, etc., can solve the problems that are not enough to effectively control the operating overvoltage of shunt reactors, and achieve the effect of eliminating threats and ensuring normal operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Such as figure 1 As shown, a shunt reactor operation overvoltage control circuit provided in this embodiment includes an empty bus 1 on which a first switch 2 is installed; the first switch 2 is connected to the shunt reactor through a cable 3 4 connected, the shunt reactor 4 is connected to the line at one end of the second switch 5, and the other end of the second switch 5 is three-phase short-circuited as a neutral point; between the shunt reactor 4 and the second switch 5 It is connected to one end of the arrester 6, and the other end of the arrester 6 is grounded.
[0018] The treatment method for the overvoltage control circuit operated by a shunt reactor includes the following steps: firstly, the first switch 2 is switched on to transmit power; when normal switching is required, the second switch 5 switches the shunt reactor Switching at the neutral point side; when the first opening phase only occurs once or several times of re-ignition, it will turn to pow...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 