Transmission and transformation project construction cost assessment method and device

A technology for engineering cost, power transmission and transformation, applied in the field of power transmission and transformation engineering, can solve the problems of rough estimation results, large calculation errors, and lack of in-depth discussion on the cost estimation method of small sample engineering data, so as to optimize the quotation strategy and improve the success of winning bids. rate effect

Inactive Publication Date: 2013-12-11
STATE GRID CORP OF CHINA +1
View PDF0 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0014] The disadvantage of fuzzy mathematics is that the description of complex problems of engineering cost estimation is too simple, so the estimation results are naturally rough
The disadvantage of gray relational theory is that it overestimates the cost similarity of different projects, and the calculation error is large, which makes it difficult to meet the accuracy requirements of the current project cost estimation within 10%.
The disadvantage of neural network is that learning requires a large training sample size to ensure the robustness and convergence of the algo

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transmission and transformation project construction cost assessment method and device
  • Transmission and transformation project construction cost assessment method and device
  • Transmission and transformation project construction cost assessment method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037]The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0038] like figure 1 As shown, the embodiment of the present invention provides a method for evaluating the cost of a power transmission and transformation project, and the method includes:

[0039] Step S101, receiving the input historical sample data and actual sample data of the power transmission and transformation project;

[0040] Step S102, initializing the number of iterations of the chaotic particle swarm, the inertia weight, the learning factor, the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a transmission and transformation project construction cost assessment method and device. The transmission and transformation project construction cost assessment method comprises the following steps: input historical sample data of a transmission and transformation project are received; iterations, inertia weight, learning factors, particle velocity of a chaos particle swarm and the population size of the particle swarm are initialized to build a chaos particle swarm model; according to the chaos particle swarm optimization, parameters of the chaos particle swarm model are optimized; according to the historical sample data and the optimized chaos particle swarm model, optimal values of the iterations, inertia weight and learning factors of the chaos particle swarm model are determined; according to the determined optimal values of the iterations, inertia weight and learning factors, penalty coefficients, insensitive coefficients and kernel function parameters of a least square support vector machine model are determined respectively to build the least square support vector machine model; input actual sample data of the transmission and transformation project are received; according to the actual sample data of the transmission and transformation project and the built least square support vector machine model, a construction cost assessment result of the transmission and transformation project is generated.

Description

technical field [0001] The invention relates to the technical field of power transmission and transformation engineering, in particular to a method and device for cost evaluation of power transmission and transformation projects. Background technique [0002] The construction of power transmission and transformation projects generally has the characteristics of huge project investment, many fields involved, and complex influencing factors. Therefore, it has always been a difficult problem to control the construction cost of power transmission and transformation projects. The cost control of power transmission and transformation projects is based on the established cost target of the calculated and determined project cost and investment cost, strictly calculates, adjusts and supervises all costs in the cost formation process, reveals deviations, corrects them in time, and ensures the cost target realization. Therefore, in order to improve the utilization efficiency of resour...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50G06Q50/06
CPCY02E60/00
Inventor 王绵斌韩锐
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products