The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
An installation method and ultra-high technology, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problems of small internal space, large concrete volume of solid section and upper box girder of pier top, etc., to solve the problem of narrow construction space, The effect of convenient construction lifting and reducing self-weight
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0023] Kind of like Figure 1 ~ Figure 4 The installation method of the solid section formwork on the top of the curved super-elevated hollow column slab pier pier shown includes the following steps:
[0024] (1) in figure 2 The two sides of the pier outer platform 4 below the solid section of the top of the pier shown are erected vertically and horizontally with I18 steel (or other small steel), and a scaffold board is laid on the top to form a work platform 5. The bottom of the pier outer platform 4 is connected to the pier through the steel structure The vertical stiffness framework 2 in column 1 (vertical stiffness framework 2 adopts 20a channel steel) is connected outside to form a force-bearing whole; connecting the bottom of the outer platform 4 of the pier with the steel of the vertical stiffness framework 2 in the pier column 1 The structure includes channel steel 7 and finished rolled rebar 6. The channel steel 7 is arranged obliquely. Its top end supports the outer pl...