A construction method and pavement layer technology, which is applied to roads, roads, on-site paved coagulation pavements, etc., can solve the problems that the two-layer structure cannot be well bonded, the work efficiency is low, and it cannot be washed with water. Layer phenomenon, high-quality construction, and high paving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] A construction method of pavement pavement, including the construction of the structure layer and the construction of the facing layer, the mixture formed by fully stirring the binder, the aggregate of 10-20mm particles, and water is spread within 2 hours Lay it on the working plane to be paved, and vibrate or flatten it as the bottom layer of the structure through the vibrating concrete of the flat plate;
[0021] For the construction of the facing layer, the virtual paving is first carried out, and the facing layer binder is mixed with the decorative materials such as aggregates with 0.1-1mm particles to form a mixture, and the facing layer material is mixed with a round rod with a diameter of 6-26mm. laid on the structural layer;
[0022] Solid paving: use 15-20kg cylindrical rollers with surface roughness < 10 microns for initial pressure leveling, after 15-20 minutes use 30-50 kg cylindrical rollers with surface roughness < 10 microns for re-pressing and leveling, ...
Embodiment 2
[0026] A construction method for a pavement pavement layer, comprising the construction of a structural layer and the construction of a facing layer, a mixture formed by fully stirring a cement binder, sandstone aggregates of 5-10mm particles, and water in 1 - 2.5 hours to pave on the working plane to be paved, vibrated and leveled by vibrating concrete or flattened as the bottom layer of the structure;
[0027] For the construction of the facing layer, the virtual paving is first carried out, and the epoxy resin binder of the facing layer is mixed with the facing materials such as sand and gravel aggregates with 0.1-3mm particles to form a mixture, and a round rod with a diameter of 6-26mm is used Lay the finishing layer material on the structural layer;
[0028] Solid paving: use 15-20kg cylindrical rollers with surface roughness < 10 microns for initial pressure leveling, after 15-20 minutes use 30-50 kg cylindrical rollers with surface roughness < 10 microns for re-pressin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com