Erect column pile construction method under geologic condition of pebble bed sandstone
A technology based on geological conditions and construction methods, applied in sheet pile walls, foundation structure engineering, construction, etc., to achieve the effects of small construction vibration, reduced diameter shrinkage, and low noise
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example
[0020] A project in Lanzhou is a landmark building in Lanzhou and even the entire northwest region. The height of the main building is 250m, which is the tallest building in the northwest region. The foundation pit area of a project in Lanzhou is about 20100m 2 , the extension meter around the foundation pit is 558m, with four underground floors, and the deepest excavation depth is 23.6m, which is the deepest foundation pit in Northwest China. In the shallow part of the project, the fine-grained filling between the particles of the silt layer and pebble layer is generally missing, with small mud content, large permeability coefficient, and strong water permeability. The sandstone layer is located below it, which is distributed throughout the site and has a deep buried depth. The pile holes of the column piles of this project penetrate the silty fine sand layer and the pebble layer, and the bottom of the pile holes is in the sandstone layer.
[0021] Carry out the hole-formin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com