Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

LNG multi-point transport ship transport-capacity prediction scheduling method

A scheduling method and transport ship technology, applied in the direction of electrical program control, comprehensive factory control, etc., can solve problems such as poor foresight, delay in decision-making, economic loss, dedicated transport capacity of transport ships, etc., and achieve the effect of strong accuracy

Active Publication Date: 2014-03-19
CHINA NAT OFFSHORE OIL CORP +1
View PDF3 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the scope of analysis of the existing technology is limited to the scope of control of a single receiving station, which cannot adapt to the model of multiple long-term supply points and multiple receiving stations, nor can it meet the production and operation requirements of multi-point joint supply, joint transportation and joint guarantee, and the technical method is based on subjective experience. and historical data, the analysis and processing of key data is relatively elementary, and the predictability of the plan is poor, resulting in a large spare tank capacity of reserved storage tanks, and the capacity of transport ships is dedicated
Under the conditions of many variable factors such as large fluctuations in downstream gas consumption, long-term supply resource arrival time delays in units of days, and high possibility of bad weather at the receiving port, the existing technical methods are more rough and general. It is very likely to cause "empty tanks" in the storage tanks (the reserved storage tanks have a large capacity), or "forced tanks" (the LNG stock is high, making it difficult to fill), and the queues of transport ships at the receiving station port, etc., which will cause delays Decision-making timing causes serious economic losses, such as fines, reduction of downstream gas supply, and even failure to provide effective guarantee for normal gas supply

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • LNG multi-point transport ship transport-capacity prediction scheduling method
  • LNG multi-point transport ship transport-capacity prediction scheduling method
  • LNG multi-point transport ship transport-capacity prediction scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

[0013] Such as figure 1 , figure 2 Shown, the inventive method comprises the following steps:

[0014] 1) Set up an LNG multi-point carrier capacity forecasting and dispatching system

[0015] In a network structure composed of multiple long-term supply points and multiple receiving stations, an LNG multi-point transport capacity forecasting and dispatching system is set up, which includes DCS1 respectively arranged in each receiving station, and a DCS1 arranged in any receiving station. The simulation system platform 2 of LNG multi-point transport capacity dispatching and the GMS terminal 3 respectively arranged in each receiving station, the simulation system platform 2 is provided with an initial parameter database 21, a simulation module 22, an index and report display module 23 and an analysis database twenty four. Wherein, DCS1 and GMS term...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an LNG multi-point transport ship transport-capacity prediction scheduling method. A LNG multi-point transport ship transport-capacity prediction scheduling system is arranged in a networked structure formed by a plurality of long-term product supply points and a plurality of receiving stations; the system includes DCSs arranged in all the receiving stations and GMS terminals arranged in all the receiving stations, and an LNG multi-point transport ship transport-capacity scheduling simulation system platform arranged in any receiving station; and a discrete simulation deduction program integrating a Monte Carlo algorithm and an operational research queuing theory is arranged in a simulation module of the simulation system platform. According to the invention, various information of all receiving stations are obtained automatically by all DCSs; and according to a transport ship arrival time window and transport ship transport-capacity distribution scheme that is obtained by simulated deduction by the simulation system platform, all the GMS terminals generate transport ship transport-capacity scheduling plans of all the receiving stations, so that the accuracy and the practical operation are high. The provided method can be widely applied to a multi-transport ship transport-capacity prediction scheduling process in various networked systems with multiple long-term product supply points and multiple receiving stations.

Description

technical field [0001] The present invention relates to a method for forecasting and dispatching LNG (liquefied natural gas) transport capacity, in particular to an LNG multi-point transport ship coordinated and optimized between multiple LNG long-term supply points (i.e. liquefaction plants) and multiple LNG receiving stations Capacity Forecasting and Scheduling Method. Background technique [0002] In the LNG industry chain, the basic function of the LNG receiving station is to unload the LNG carrier from the long-term supply point via the ocean, store the LNG material in the LNG storage tank after unloading, and transfer the LNG according to the downstream gas demand. After gasification, it is exported to three types of gaseous users: industrial, civil and gas-fired power plants. At the same time, a small part of LNG is directly transported out in liquid form through LNG tankers. The core of the receiving station's ADP (annual delivery plan) process for long-term supply ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/418
Inventor 付子航邱健勇唐令力单彤文崔峰程昊刘冰周婵
Owner CHINA NAT OFFSHORE OIL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products