Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Active power distribution network transient state real-time simulation system designing method based on FPGA

A real-time simulation and system design technology, applied in computing, electrical digital data processing, special data processing applications, etc., can solve problems such as limiting data transmission efficiency and limited ports, achieve dynamic response characteristics, ensure real-time performance, and be feasible Effects of sex and applicability

Inactive Publication Date: 2014-05-14
GUANGDONG POWER GRID CO LTD +2
View PDF3 Cites 38 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

FPGA essentially has a fully configurable inherent hardware parallel structure, and its logic resources can be configured as many parallel processing units to achieve multi-level highly parallel computing; at the same time, FPGA chips have a large number of embedded block RAMs, which can be configured as a large number of distributed ROMs Or RAM, its data and address width, and the number of ports can be configured, while the memory and bus in traditional real-time simulators are mostly shared, and the ports are limited, which limits the efficiency of data transmission; FPGA allows the use of pipeline technology, which strengthens data processing Efficiency, and FPGA also has a large number of internal connections with extremely fast transmission speeds, which will not introduce excessive communication delays

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Active power distribution network transient state real-time simulation system designing method based on FPGA
  • Active power distribution network transient state real-time simulation system designing method based on FPGA
  • Active power distribution network transient state real-time simulation system designing method based on FPGA

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] The design method of the FPGA-based active distribution network transient real-time simulation system of the present invention will be described in detail below in conjunction with the embodiments and the accompanying drawings.

[0049] FPGA-based active distribution network transient real-time simulation system design method of the present invention, as attached figure 2 As shown, the active distribution network transient real-time simulation system is divided into offline simulation environment and online simulation environment, in which the offline simulation environment is responsible for the real-time simulation time t total According to the calculation of real-time simulation time t total Set the simulation step size Δt, and upload the relevant parameters calculated according to the simulation step size Δt and the read basic parameter information to the FPGA-based online simulation environment; the online simulation environment completes the real-time calculation...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an active power distribution network transient state real-time simulation system designing method based on an FPGA. The active power distribution network transient state real-time simulation system designing method can be implemented in an off-line simulation environment and an on-line simulation environment in a dividing mode, the off-line simulation environment is responsible for calculating the total clock period number-n<total> and simulation using time-t<total> calculated in each time step, the simulation step size deltat is set according to the real-time simulation using time-t<total>, relevant parameters calculated according to the simulation step size deltat and the read basic parameter information are uploaded to the on-line simulation environment based on the FPGA. Real-time simulation calculation is completed in the on-line simulation environment, the simulation state is controlled through a finite-state machine, each time step includes the steps of historical item current source column vector calculation of all elements, total historical item current source column vector formation of the elements and linear equation system solving and updating of the elements, and the historical item current source column vector calculation step of the elements and the updating step are completely independent and can be processed in a concurrent mode. According to the active power distribution network transient state real-time simulation system designing method based on the FPGA, the real-time performance of the transient state simulation process of the whole system is guaranteed, and the good feasibility and the good applicability are achieved.

Description

technical field [0001] The invention relates to a power system simulation design method. In particular, it relates to a design method of an FPGA-based transient real-time simulation system for an active distribution network. Background technique [0002] Active distribution network transient real-time simulation is a digital simulation method that is synchronized with the real clock. By connecting the real-time simulator with actual physical equipment, the development and testing of various control and protection devices can be carried out, and it can simulate lighting, The complex transient process of the active distribution network under various operating scenarios such as wind speed changes, voltage drops, short-circuit faults, and load shedding can effectively reduce the cost of research and development and testing, and avoid the impact of the equipment under test on the actual system. Active distribution network transient real-time simulation is mainly used for distrib...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
Inventor 王成山丁承第李鹏于浩董旭柱于力黄红远黄小耘
Owner GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products