Prefabricating and using method of planting growing building block for ecologically repairing exposed slope
An ecological restoration and block technology, applied in the field of planting blocks, can solve the problems of uneven slope excavation, too steep slope, long rainy season, etc., to prevent water evaporation on the slope, good ecological landscape, and vegetation coverage. high effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0033] Example 1: Prefabrication of vegetation blocks
[0034] as attached image 3 As shown, first make a cube mold, its structure is: the upper and lower sides are hollow, and the other four sides (8) are locked and closed by the loose-leaf (10), which can be opened when the mold is removed after pouring; the four sides (8) of the closed outer walls are left There are vegetation holes (9), and the vegetation holes (9) are one of circular and rectangular, so that the detachable cylindrical mold rod or cuboid module (11) passes through to form 2 vegetation channels (1); if To form three vegetation passages (1), first insert a cylindrical mold rod or a cuboid module (11) from the upper and lower sides of the hollow, and then relatively insert mutually separated cylinders from the vegetation holes (9) on the outer walls of the four sides (8) Model rods or cuboid modules (11) are pressed against each other to form a detachable fixed structure. The present embodiment all establi...
example 2
[0040] Example 2: The use of vegetation blocks
[0041] Take the experiment of ecological restoration and protection of an exposed slope in South China as an example. The slope is a strongly weathered rock slope with a slope ratio of 1:1 to 1:0.25, a first-grade slope with a height of 6 meters and an area of 12,000m 2 , using the prefabricated planting blocks of the present invention for construction. During construction, the foundation shall be excavated, leveled, and compacted first, and then the blocks shall be piled up along the slope to build a retaining wall, and the vegetation channel shall be filled with the vegetation base material while building. See Table-1 for the preparation of the vegetation base material.
[0042] Table-1 List of preparation materials and dosage of plant substrates
[0043]
[0044] Align the vegetation channels (1) up, down, left, and right between the blocks, and use ecological concrete mortar to smear the joints. When the slope ratio ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 