Concrete Pouring Method of Partition Wall Vault in Multi-Arch Tunnel
A multi-arch tunnel and concrete technology is applied in the field of concrete pouring, which can solve the problems of reduced concrete strength, easy occurrence of pipe blockage, inability to grouting, etc., and achieves the effects of improving work efficiency, improving engineering construction quality, and reducing engineering costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0060] The present invention will be further described below in conjunction with embodiment and accompanying drawing.
[0061] The tunnel conditions for the application of the concrete pouring method for the vaulted roof of the partition wall in the multi-arch tunnel are as follows: the clear space of the pilot hole in the tunnel is 5.21 meters, the arch part adopts a semicircle of 2.5 meters, the design net width is 5 meters, and the wall surface of the partition wall adopts a radius of 6.3 meters. The 41-degree arc and the 60-degree arc of the arch form the upper structure of the partition wall, and the lower structure adopts a 46cm thick foundation. Use the following procedures to construct the upper structure of the partition wall: processing steel formwork and steel formwork → measuring the center line on the basis of the partition wall → positioning the formwork track → moving the formwork in place → reinforcing the formwork → laying out the concrete pump pipe → pouring t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 