A technology of duplex stainless steel and production process, applied in the field of production process of super duplex stainless steel pipe, can solve the problems of low production efficiency, difficult to guarantee wall thickness accuracy, complex production process, etc., so as to improve the yield and product accuracy, shorten the The effect of simple production time and production process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 2
[0030] 2. Embodiment 2, a production process of a super duplex stainless steel pipe, is characterized in that it comprises the following process steps:
[0031] 1) Cold rolling: the steel pipe is cold-rolled back and forth 5 times by the upper and lower rollers. During the process of resetting the rollers after each cold rolling, the mandrel and the steel pipe rotate together by 20°. Repeat the above steps to ensure that the mandrel and the steel pipe are completely The sum of the rotation angles is 100°;
[0032] The lubricating oil is sprayed from the mandrel to the inner surface of the steel pipe, the flow rate of the lubricating oil is 2 liters per minute, the injection pressure is 2.5Mpa, and the temperature of the lubricating oil is 20°C.
[0033] 2) Degreasing and cleaning; spray the entire surface of the steel pipe with carbon tetrachloride, and then dry the surface of the steel pipe with high-pressure gas;
[0034] 3) Heat treatment: heating in a heating furn...
Embodiment 3
[0039] 3. Embodiment 3, a production process of a super duplex stainless steel pipe, comprising the following process steps:
[0040] 1) Cold rolling: the steel pipe is cold-rolled back and forth 4 times by the upper and lower rollers. During the process of resetting the rolls after each cold rolling, the mandrel and the steel pipe are rotated 30° together, and the above steps are repeated to ensure that the mandrel and the steel pipe are together. The sum of the rotation angles is between 120°;
[0041] During the cold rolling process, lubricating oil is sprayed from the mandrel to the inner surface of the steel pipe, the flow rate of the lubricating oil is 3 liters per minute, the injection pressure is 3Mpa, and the temperature of the lubricating oil is 25°C.
[0042] 2) Degreasing and cleaning; Spray the entire surface of the steel pipe with gasoline, and then dry the surface of the steel pipe with high-pressure gas;
[0043] 3) Heat treatment: heating in a heating fur...
PUM
| Property | Measurement | Unit |
|---|---|---|
| tensile strength | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More