Preheating process of dust remover for filtering combustible dusty gas

A dust collector and process technology, which is applied in the direction of dispersed particle filtration, chemical instruments and methods, and dispersed particle separation, can solve the problems of low preheating temperature, difficulty in ensuring the safety performance of combustible components, and difficulty in application, etc., and achieves a small footprint , improve the safety performance of equipment, and the effect of reasonable layout

Active Publication Date: 2014-08-06
HENAN DRAGON INTO COAL TECH CO LTD
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The method preheats the interior of the dust collector by using the heat energy of the exhaust smoke in the ignition stage of the boiler, and preheats the ash hopper of the dust collector by using the heat energy of the exhaust smoke in the ignition stage of the boiler, so as to eliminate the dust removal that may occur in the ignition stage of the boiler. Condensation inside the dust collector, but its preheating temperature is low, and it is difficult to apply to gases containing coal tar and other strict requirements on the internal temperature of the dust collector, and it is difficult to guarantee the gas safety performance of combustible components

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Preheating process of dust remover for filtering combustible dusty gas
  • Preheating process of dust remover for filtering combustible dusty gas

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] A dust collector preheating process for filtering combustible dust-laden gas, involving equipment including a hot blast pipe 3 arranged on the side of the dust collector 2 through a support frame 1, and a hot blast stove 4 and a fan 5 are connected in series to the hot blast pipe 3 , the fan 5 is arranged at the front section of the air intake of the hot blast stove 4, and the air outlet of the clean air chamber of the dust collector 2 is connected to the clean air delivery pipeline 7 of the dust collector 2, and the clean air delivery pipeline 7 is located at a high position, and the The clean gas conveying pipeline 7 is provided with the branch air pipe 8 connecting the blower fan 5, the output end of the hot blast stove 4 is provided with a chimney 9, and an emptying mechanism 10, temperature Detection device and oxygen content detection device, described emptying mechanism 10 and chimney 9 are provided with electric regulating valve 11, and described emptying mechani...

Embodiment 2

[0026]The difference from Embodiment 1 is that: the hot air duct 3 is provided with several groups of output end branches, which can be one group, two groups, four groups, or even more, and the several groups of output end branches are respectively connected to parallel dust collectors 2 The dusty gas intake pipe 13.

Embodiment 3

[0028] The difference from Embodiment 1 or 2 is that: the heating temperature in the heating stage is 330°C, and the replacement adjustment stage makes the oxygen content in the dust collector 2 after adjustment be 1.4%, wherein the temperature rising rate in the heating stage is controlled to be <100°C / h.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a preheating process of a dust remover for filtering combustible dusty gas. The preheating process comprises a dust remover cold-air exhausting period, a temperature rise period and a gas replacement-adjustment period and specifically comprises the steps of inputting high-temperature gas through a hot air pipeline to exhaust low-temperature gas in the dust remover in the cold-air exhausting period, entering the temperature rise period after the low-temperature gas is exhausted, raising the temperature to 330-1200 DEG C, carrying out gas replacement and adjustment, and entering a conventional filtering-dust removal process link after adjusting the oxygen content in the dust remover to a safety range in the gas replacement-adjustment period. The preheating process is novel and ingenious, has a good utilization effect in a booting preheating link of the dust remover, realizes the innovation of the preheating process of the high-temperature dust remover, is suitable for preheating the dust remover for filtering the high-temperature and high-tar-content dusty gas and guarantees a good filtering effect, long service cycle and high economic benefit of a filter core.

Description

technical field [0001] The invention belongs to the technical field of dust removal and heating equipment for dust collectors, and in particular relates to a dust collector preheating process for filtering combustible dust-containing gas. Background technique [0002] At present, my country is short of oil and natural gas resources, and coal will remain the most important primary energy source for a long time to come. However, there are many problems and challenges in the process of coal conversion and utilization, such as low comprehensive utilization efficiency, serious environmental pollution, shortage of water resources, and large carbon dioxide emissions. Therefore, it is an inevitable choice for the development of my country's energy industry to develop coal efficient and clean comprehensive utilization technology to achieve energy conservation and emission reduction. The "Twelfth Five-Year Plan" for the development of clean coal technology and technology, which is en...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B01D46/42
Inventor 朱书成赵家亮李金峰庞志峰
Owner HENAN DRAGON INTO COAL TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products