Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power grid planning method based on multi-core grid construction mode

A power grid planning and multi-core technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as high short-circuit current, high risk of large-scale power outages, and unclear application prospects, so as to simplify the structure, avoid large-scale power outages, The effect of risk diversification

Active Publication Date: 2014-09-10
GRID POWER PLANNING & RES CENT OF GUANGDONG GRID POWER CO LTD +1
View PDF4 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Among them, the vision of the network construction mode of the inner and outer ring network will be difficult to solve the problems of complex grid structure, high short-circuit current, and high risk of large-scale power outages; the UHV AC network construction mode has the main shortcomings of system stability and reliability that are not easy to solve. The application prospect is not clear; the group network construction mode enhances the controllability of the power flow and reduces the risk of large-scale power outages and grid collapses, but it does not have strong guidance for the internal network structure of the group and lacks actual support for the network structure plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid planning method based on multi-core grid construction mode
  • Power grid planning method based on multi-core grid construction mode
  • Power grid planning method based on multi-core grid construction mode

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments.

[0055] Such as figure 1 Shown, the present invention comprises the following steps:

[0056] (1) Obtain the status quo and planning boundary conditions of the power grid;

[0057] The status quo of the power grid includes the load and power conditions of the planning area and its sub-regions, the installed capacity and output of power sources, the exchange of power and power, and the grid structure and existing problems such as heavy overload of lines and substations. Planning boundary conditions usually include load forecasting, power supply planning scheme and substation layout planning scheme during the planning period. Similar to conventional power grids, this part is the basic condition of power grid planning and can be obtained from power grid companies at all levels in the planning area.

[0058] (2) Divide the core power grid;

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a power grid planning method based on a multi-core grid construction mode. The method comprises the following steps of acquiring the current power grid situation and planning boundary conditions, dividing core power grids, making the grid construction scheme of each core power grid, determining the interconnection mode among the core power grids, carrying out electrical check and analysis, making an implementation scheme of each stage and investment estimation, and outputting a target grid structure planning scheme. Through leading loads and power supplies to develop harmonically, self-balanced core power grids and the backbone grid structures are formed gradually, connection among the core power grids is simplified gradually and weakened, the target grid structure forms the structure with the core power grids as the basic units finally, each core power grid can basically realize self balancing in actual running, and the core power grids are independent relatively and can support each other. Differential planning is carried out on connection among the core power grids, the planned target grid structure has the advantages that the structure is simple and risks are dispersed, local grids can be abandoned to save the entire grid in the case of severe failure, and large-area blackout can be effectively avoided.

Description

technical field [0001] The invention relates to a grid planning method, in particular to a grid planning method based on a multi-core network construction mode. Background technique [0002] Economic development, electricity first. In order to ensure the sustainable development of the economy and society, solve the problems existing in the current and future development of the power grid, and avoid large-scale power outages, it is urgent to start from the long-term target power grid structure, optimize and adjust the planning of the power grid to ensure the safe operation and long-term stability of the power grid. [0003] The traditional power grid planning method-the research method of the target grid structure, in the face of the increasingly complex grid structure, it is difficult to control the power flow, it is difficult to build the second and third defense lines of the grid security, and the ability to resist serious faults is poor. There is a risk of large-scale po...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 吴烈鑫林勇吴伟杰樊扬
Owner GRID POWER PLANNING & RES CENT OF GUANGDONG GRID POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products