Unlock instant, AI-driven research and patent intelligence for your innovation.

A second high-pressure grouting expansion head bolt and its construction method

A secondary grouting and expanding head technology, which is applied in the direction of foundation structure engineering, construction, sheet pile wall, etc., can solve the problem of poor grip between the anchor and the surrounding soil, poor grip between the anchor and the rod, and compression The end is not dense and other problems, to achieve the effect of large pull-out force, large pull-out force, and small displacement after tension

Active Publication Date: 2016-10-05
成都四海岩土工程有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantages are: 1. The anchoring force depends on factors such as the length of the anchoring section and the nature of the soil in contact with the anchoring section. If it encounters a special soft soil, the reinforcement effect will not be good; 2. Ordinary high-pressure jet expansion head The anchor has the problem of low cement-soil strength and poor grip between the anchor and the rod; 3. The Xiang-type anchor has poor grip between the anchor and the surrounding soil, and the compressed end is not compact

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A second high-pressure grouting expansion head bolt and its construction method
  • A second high-pressure grouting expansion head bolt and its construction method
  • A second high-pressure grouting expansion head bolt and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] See Figure 1 ~ Figure 6 , The present invention includes an anchor rod body 1, a grouting bag and a grouting pipe. The anchor rod body 1 is fitted with 2 to 3 P anchors 4, and the front end of the anchor rod body is equipped with a guide cap 6 to form a pressure dispersion type unbonded anchor rod. Rod body. The key technology is that the front section of the bolt body 1 is provided with a centering grouting bag 3, the rear section of the bolt body 1 is provided with a secondary grouting bag 2, and the bolt body is provided with a primary grouting tube 5 and a secondary grouting tube 8. The outlet of the primary grouting pipe 5 is located at the front end of the anchor rod body in the centering grouting bag 3, and the outlet of the secondary grouting pipe 8 is located at the front end of the secondary grouting bag 2.

[0026] The P anchor 4 is located in the centering grouting bag 3.

[0027] An exhaust pipe 7 is provided on the anchor rod body, and the outlet of the exha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a secondary high-pressure grouting expansion head anchor rod and a construction method, which belong to a novel anchor structure and its construction method. It includes the anchor rod body, grouting bag and grouting pipe. The key technology is that the front part of the anchor rod body is provided with a centering grouting bag, the rear part of the anchor rod body is provided with a secondary grouting bag, and the anchor rod body is provided with a primary grouting bag. For the grouting pipe and the secondary grouting pipe, the outlet of the primary grouting pipe is located at the front end of the anchor rod body in the centering grouting bag, and the outlet of the secondary grouting pipe is located at the front end of the secondary grouting bag. The construction method of the second high-pressure grouting expansion head bolt includes hole making, rod body placement, centering grouting bag grouting, secondary grouting and tension locking. The beneficial effect of the present invention is: after the primary grouting is solidified, the secondary grouting bag is grouted by using the secondary high pressure, and the high pressure grouting will compact or crack the cement and soil in the back section of the expansion head, so that the anchoring body Preload is applied to enhance the frictional resistance between the anchor and the soil, thereby improving the pullout resistance of the anchor.

Description

Technical field [0001] A secondary high-pressure grouting enlarged head anchor rod and a construction method thereof belong to a new type of anchoring structure and its construction method. The anchoring structure is widely involved in the fields of foundation pit support, slope support and foundation anti-floating engineering of construction engineering. Background technique [0002] The existing anchor rods used in underground engineering and slope reinforcement projects mainly rely on the adhesion and friction of the anchoring section and the surrounding soil to transfer loads, and belong to friction anchor rods. The disadvantages are: 1. The anchoring force depends on the length of the anchoring section and the nature of the soil in contact with the anchoring section. If it encounters special soft soil, the reinforcement effect is not good; 2. The ordinary high-pressure jet expansion head The anchor rod has the problems of low cement-soil strength and poor binding force betw...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/74E02D15/04
Inventor 岳大昌李明廖心北吴文学贾欣媛徐继忠
Owner 成都四海岩土工程有限公司