A prestressed bellows fixing device and method for fast and accurate positioning
A technology for accurate positioning and fixing devices, applied to structural elements, building components, building reinforcements, etc., can solve the problems of high material investment, difficult positioning and fixing of bellows, etc., to avoid construction time, high practicality and promotion value , High construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Such as figure 1 As shown, it is a structural schematic diagram of the device. The left part of the pool body wall 1 structure of the airtight pool is equidistantly arranged with the first main rib structure 2 arranged in parallel, and the first main rib structure 2 constitutes the thickness of the protective layer. The right part of the pool body wall The second main reinforcement structure 3 and the corrugated pipe fixing reinforcement device 4 arranged in parallel are arranged at equal intervals. The bellows fixing reinforcement device 4 and the outer wall of the pool body 5 constitute the distance of the isolation layer. The thickness of the structure includes the thickness of the protective layer and the distance of the isolation layer. The first The upper and lower parts of the main reinforcement structure 2 are respectively connected to the upper and lower reinforcement bars of the second main reinforcement structure through I-shaped steel bars 6, and the bellows ...
Embodiment 2
[0023] This device was improved and summarized during the construction process of the sludge digestion tank of the Kunming sludge disposal project. Since the digestion tank is constructed by the bonded prestressed sliding form method, the positioning of concrete, steel bars and corrugated pipes and fixed construction time and sliding are required. The mold lifting time is matched, the vertical spacing of prestressed steel bars is designed to be 25cm-50cm, and the distance from the center of the bellows to the outer pool wall is 11cm. The design requires that the construction positioning error of the bellows should not exceed 5mm. According to the specific requirements of the prestressed bellows, combined with the existing technical conditions, the positioning and fixing of the prestressed bellows were tested, optimized and improved, and implemented after the improvement. The implementation effect was satisfactory and the expected goal was achieved.