Guide device and construction method for follow-up beam surface cable stay cable entry hole
A construction method and technology of cable-stayed cables, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of occupying a large space on the beam surface, unable to construct cable-stayed cables, and small application range, so as to achieve structural stability and reliability Strong adjustment and wide application range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] This embodiment is a follow-up beam-face inclined stay cable stay-cable guide hole entry guide device, a follow-up beam-surface stay cable stay-cable guide hole entry guide device, which includes: A-shaped bracket 1, sash beam 2, Traveling longitudinal beam 3, mobile lifting point 4 and lifting system 5.
[0022] like figure 1 As shown, there are four A-shaped brackets 1, which are respectively welded with I-beams, and are all composed of inclined columns 101 and beams 102. There are two sash beams 2 that all adopt box-shaped cross-sections, and each sash The beams 2 are all arranged on the tops of the two A-shaped brackets 1 to form the main load-bearing system. The top of each sash beam 2 is provided with a bolt hole for connecting the running stringer 3, and the running stringer 3 passes through the bolt holes. The holes are erected on two sash beams 2, and the running longitudinal beam 3 is processed by two I-shaped steel rails, leaving a gap of 8cm to 10cm between...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 