Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel and underground engineering information monitoring and measurement method based on b/s and C/S architecture mode

A technology for underground engineering and tunnels, applied in computer control, general control systems, control/regulation systems, etc., can solve problems such as low work efficiency, hidden dangers in construction safety, and mere formality, so as to facilitate the monitoring of the whole process and improve work efficiency. efficiency effect

Active Publication Date: 2017-05-03
中铁西南科学研究院有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, in the implementation of specific work, there are also many difficulties in how to ensure that all construction units implement it in a standardized and comprehensive manner.
First, the construction unit has difficulties in monitoring the whole process of monitoring and measurement; the construction unit checks the implementation of the tunnel construction monitoring and measurement work of each construction unit, mainly by watching the site, listening to reports, and checking data. The traditional methods are single and cannot be real-time. Or to control the actual situation on site in a timely manner. In the process of implementation, each unit often has to deal with inspections and compilation of completion materials, which are mere formalities and bury great hidden dangers for construction safety.
Second, on-site monitoring and measurement data collection, analysis and feedback are difficult to meet the timeliness. At present, the monitoring personnel of a construction unit often have to face the data collection, analysis and feedback work of multiple working faces. It will take several hours or longer to process and sort out the report, and the work efficiency is not high, resulting in untimely information feedback, which delays the time for on-site disposal to a certain extent

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel and underground engineering information monitoring and measurement method based on b/s and C/S architecture mode

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0013] Such as figure 1 As shown, the tunnel and underground engineering information monitoring and measurement method based on B / S and C / S architecture mode includes mobile smart terminal data collection method, server-side data processing method, mobile smart terminal data query and early warning information receiving method and PC The computer client data processing method; the tunnel and underground engineering information refers to the displacement data of the vault sinking, the surrounding convergence, and the stress and strain monitoring measurement data.

[0014] The mobile intelligent terminal data collection method: firstly carry out unique coding step by step according to the level of project information "project name-tender section-single project (or work area) name-special project name-section-measuring point", select during data collection...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a B / S and C / S architectural pattern based information monitoring and measuring method for tunnels and underground constructions. The method includes the steps of data collection of a mobile intelligent terminal, data processing of a server side, data query and early-warning information reception of the mobile intelligent terminal, and data processing of a PC (personal computer) client side. The mobile intelligent terminal is connected with an instrument in a wired or wireless mode, and test data are collected in real time, stored in the mobile intelligent terminal, and uploaded to the server side immediately through a wireless network; the server side performs data visualization display and early-warning release on the data uploaded by the mobile intelligent terminal; the mobile intelligent terminal inquires the data processed by the server side and receives the early-warning information released by the server side in real time; the PC client side downloads the data uploaded by the mobile intelligent terminal from the server side to process data and output statements. By the method, functions such as timely field data collecting, automatic analyzing and processing and remote monitoring for field monitoring and measuring can be realized in the tunnels and the underground constructions.

Description

technical field [0001] The invention relates to a method for managing monitoring and measuring information of tunnels and underground engineering, in particular to a method for monitoring and measuring information of tunnels and underground engineering based on B / S and C / S architecture modes. Background technique [0002] Tunnel and underground engineering monitoring and measurement is an essential process in the construction process. Through timely and effective monitoring and measurement information feedback, it can correctly guide the construction and reduce the probability and loss of engineering accidents. It is a key to ensure the safety of engineering construction. an important means. [0003] At present, in the implementation of specific work, there are also many difficulties in how to ensure that each construction unit implements the standard and comprehensive implementation. First, the construction unit has difficulties in monitoring the whole process of monitorin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G05B15/02
Inventor 詹显军尚海松伍晓军陈礼伟汪小波李海峰陈博
Owner 中铁西南科学研究院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products