A mobile floating body and its mobile mud suction construction method
A mobile and floating body technology, which is applied to floating buildings, infrastructure engineering, earth movers/excavators, etc., can solve the problems of frequent mud suction position changes, long construction period, and high construction costs, and achieve saving position changes The effect of saving time, shortening the construction period, and ensuring the quality of the back cover
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Such as figure 1 , 2 , 3 and 4, a mobile floating body, the mobile floating body includes two equal-length and parallel vertical steel pipe piles 1 arranged at relative intervals, and the two ends of the vertical steel pipe piles 1 are girth welded with Sealing steel plate 5, three horizontal steel pipe piles 2 arranged in parallel and with equal spacing are welded through intersecting welding between two vertical steel pipe piles 1 to form the entire floating body frame, and two vertical steel pipe piles 1 are each provided with a vertical To the angle steel 3, two horizontal angle steels 4 are arranged between the two ends of the two vertical angle steels 3, the horizontal angle steel 4 and the vertical angle steel 3 are enclosed to form a floating body platform support, and the floating body platform support is covered with scaffolding boards 10 to form a floating body The work platform also reserves the holes for the dredge, and the floating body frame is provided ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 