A technology of modified asphalt and production process, which is applied in building components, building insulation materials, buildings, etc. It can solve the problems of long shearing and grinding time, inability to effectively reduce production costs, long production time, etc., and achieve high temperature aging resistance. , Improve the effect of shearing and grinding, and slow down the effect of performance attenuation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] (1) Heating and heating: the No. 90 heavy traffic road asphalt is heated to 192°C through a heat transfer oil heat exchanger, and pumped into the premix tank through pipelines;
[0035] (2) Premixing and mixing: When adding asphalt to cover the bottom of the premixing tank, mix 100 parts by weight of asphalt with 3.6 parts by weight of linear SBS modifier, 0.25 parts by weight of stabilizer, and 0.05 parts by weight of anti-aging agent. With the inflow of asphalt, gradually add SBS modifier, stabilizer and anti-aging agent, and stir and mix at the same time, the stirring temperature is 189 ° C, and the stirring time is 18 seconds;
[0036] (3) Shear grinding: pump the above-mentioned asphalt mixture into a high-shear colloid mill at a rate of 1 ton / min, and shear and grind at 187°C to make more than 86% of SBS The active agent is crushed into particles with a particle size of 2 to 5 microns;
[0037] (4) Stirring and development: transport the sheared and ground mixtur...
Embodiment 2
[0044] (1) Heating and heating: the No. 70 heavy traffic road asphalt is heated to 194°C through a heat transfer oil heat exchanger, and pumped into the premix tank through pipelines;
[0045] (2) Premixing: When adding asphalt to cover the bottom of the premixing tank, mix 100 parts by weight of asphalt with 3.7 parts by weight of linear SBS modifier, 0.26 parts by weight of stabilizer, and 0.03 parts by weight of antiaging agent. With the inflow of asphalt, gradually add SBS modifier, stabilizer and anti-aging agent, and stir and mix at the same time, the stirring temperature is 190 ° C, and the stirring time is 16 seconds;
[0046] (3) Shear grinding: pump the above-mentioned asphalt mixture into a high-shear colloid mill, the speed of the high-shear colloid mill is 1 ton / min, and shear and grind at 189°C, so that more than 86% of the SBS The active agent is crushed into particles with a particle size of 2 to 5 microns;
[0047] (4) Stirring and development: transport the ...