Construction method of shallow-buried and underground excavated large-section tunnel in tailings slag fill area
A technology for shallow buried excavation and tunnel construction, which is applied to tunnels, tunnel linings, mining equipment, etc. It can solve problems such as poor self-stabilization, low shear strength, and large spans, and achieve the effect of simplifying difficulty and ensuring construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0066] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0067] see figure 1 , figure 1 It is a flow chart of the construction method of the shallow-buried underground excavation and large-section tunnel in the tailings slag filling area of the present invention. Cooperate with reference figure 1 Shown, the tailings slag filling area of the present invention shallow burial underground excavation large-section tunnel construction method, comprising:
[0068] S101 Carry out sleeve valve pipe grouting reinforcement treatment to the slag fill soil on the ground according to the reinforcement range of the construction survey and stakeout;
[0069] ...