Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Clustered perforating and staged fracturing combined process

A staged fracturing and clustering technology, which is applied in the field of oil and gas field exploration and development, can solve the problems of difficult formation of network fractures in oil and gas reservoirs, sticking guns, and low timeliness of oil and gas well testing, so as to avoid the risk of polluting oil and gas layers , Improving the efficiency of well completion operations and improving the effect of fracturing operations

Active Publication Date: 2015-09-02
BC P INC CHINA NAT PETROLEUM CORP +1
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Due to the limitation of ultra-high temperature, ultra-high pressure and ultra-deep wells, conventional perforation technology and staged fracturing technology cannot be safely and effectively applied in such wells
Ultra-high temperature and ultra-high pressure ultra-deep oil and gas reservoirs have reservoir characteristics such as well depth of 6000-8500m, well temperature of 150-200℃, and formation pressure of 110-140MPa. Perforation and completion of wells are generally performed with casing. In order to ensure the safety of oil and gas well construction, often in Under the condition of heavy mud, one-time drill pipe transmission perforation operation is performed for all reservoirs, and the wellbore pressure is higher than the formation pressure. This operation method is likely to cause the mud to invade the reservoir after perforation and pollute the reservoir, and the subsequent general reservoir fracturing The stimulation operation cannot form a network of fractures in the reservoir, and the staged fracturing operation cannot be implemented, and the oil and gas production effect cannot meet expectations
[0004] In addition, when this type of well is perforated, the packer is connected to the well and the perforating and testing combined process or the perforating and fracturing process is combined. After the tubing or packer is vibrated, there will be leakage, and the oil and gas well testing time will be low, and even the life of the oil and gas well will not be long
[0005] Conventional cable transmission cluster perforation technology generally uses a digital address integrated circuit selective firing control module for underground cluster selective firing operations. The maximum temperature resistance of this control module is 150°C. If the temperature exceeds this temperature, the address will be lost and communication will not be possible. Phenomenon
[0006] Staged fracturing technology, as the latest means of oil and gas well reservoir stimulation at the present stage, can perform fracturing on the reservoir purposefully, promote the formation of network fractures in the reservoir, better communicate oil and gas fractures, and achieve high production of oil and gas wells , often combined with cluster perforation, it cannot be efficiently implemented in oil and gas wells after drill pipe transmission and perforation, and it is difficult to form network fractures in heavily polluted oil and gas reservoirs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Clustered perforating and staged fracturing combined process
  • Clustered perforating and staged fracturing combined process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] A clustered perforation and staged fracturing combined production process, comprising the following steps:

[0035] a. According to the logging interpretation results, staged fracturing or volume fracturing process requirements, determine the clustering of perforated sections;

[0036] b. Run the completion string, run the completion tool, and seat the packer according to the design requirements to replace the completion fluid;

[0037] c. The first stage of perforating operation is completed by the cluster perforating technology conveyed by the pressurized cable through the tubing;

[0038] d. Fracturing construction;

[0039] e. After the first stage of fracturing is completed, put in degradable fiber temporary plugging balls to plug the perforation holes, and repeat the second stage of cluster perforation and fracturing until the perforation and fracturing operations of the entire well are completed.

[0040] In the step b, after the wellbore is cemented and comple...

Embodiment 2

[0051] The present embodiment further illustrates the present invention in conjunction with the accompanying drawings:

[0052] like figure 1 , After the wellbore 11 is cemented and completed, the completion string 9 is run down, the packer is seated, and the completion fluid 13 is replaced to prepare for cluster perforation. After the cable blowout preventer is installed at the wellhead, the cable 10 is used to run into the clustered perforating pipe string 12, and the first cluster is lifted up a certain distance after ignition to carry out the ignition operation of the subsequent clusters. After the ignition is completed, the clustered perforation string is pulled out to prepare for fracturing. Press the fracturing procedure to perform the first-stage fracturing operation. After the fracturing is completed, put in degradable fiber temporary plugging balls to block the perforation holes, and prepare for the second-stage perforation operation. The cluster perforation and st...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a clustered perforating and staged fracturing combined process which comprises the following processes: a, determining the perforated interval clustering according to the requirements of well logging interpretation results and staged fracturing or volume fracturing processes; b, lowering a completion pipe string, lowering a completion tool, and sealing a packer according to the design requirements, and filling with a completion fluid; c, completing the first-stage perforating operation by adopting an under-pressure cable conveying oil passing pipe clustered perforating technology; d, performing fracturing construction; e, after the first-stage fracturing is completed, throwing degradable fiber temporary plugging balls to plug perforating holes, repeating the second-stage clustered perforating and fracturing till the perforating and fracturing construction operation of a whole well is completed. The requirement of ultrahigh-temperature ultrahigh-pressure ultra-deep well one-trip pipe string separated layer fracturing can be met, the high-efficient development of the well is realized, the ultrahigh-temperature ultrahigh-pressure perforating and fracturing completion practice is simplified, the operation ageing is improved greatly, the fracturing operation effect is improved, and the oil and gas production layer protection is beneficial to be improved, and the single well productivity is improved.

Description

technical field [0001] The invention relates to an ultra-high temperature and ultra-high pressure clustered perforation staged fracturing combined technology, which belongs to the field of oil and gas field exploration and development. Background technique [0002] Ultra-high temperature and ultra-high pressure perforating technology has entered large-scale commercial applications, and has been widely used in Tarim Oilfield and Sichuan Oil and Gas Field. For example, in the first issue of "Logging Technology" in 2014, the application of ultra-high temperature, ultra-high pressure and ultra-deep perforation technology in the piedmont block announced the following: A series of problems such as high temperature, ultra-high pressure, wellbore integrity, and pipe string safety. In the early stage of oil and gas well construction, the integration and optimization of excitation pressure prediction technology, wellbore dynamic pressure prediction technology, pipe string mechanics a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B43/26E21B43/116
Inventor 唐凯陈锋彭建新陈建波陈华彬贾宝贵邹国庆
Owner BC P INC CHINA NAT PETROLEUM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products