Top-plate-prefabricated underground space underground excavation building method
An underground space and roof technology, which is applied in underground chambers, earth drilling, mining equipment, etc., can solve the problems of high construction cost, slow construction efficiency, poor construction quality and reliability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The specific implementation manner of the present invention will be described in more detail below with reference to schematic diagrams. Advantages and features of the present invention will be apparent from the following description and claims. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0040] Such as figure 1 As shown, the present invention provides a method for constructing underground space with prefabricated roof, including:
[0041] Such as Figure 2-4 As shown, the originating shaft 7 and the receiving shaft 8 are constructed on both sides of the proposed underground space 2, and the proposed underground space 2 is divided into a plurality of channels arranged at intervals, so that each channel runs along the originating shaft 7 to the receiving shaft. The direction of the well 8 is set...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com