Innocent treatment device and process for scrap materials disassembled from aluminum electrolytic cells
A harmless treatment, aluminum electrolytic cell technology, applied in the direction of solid waste removal, etc., can solve the problems of lack of harmless treatment and utilization means, and achieve the effect of low treatment cost, elimination of potential hazards, and simple and easy method.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Example 1 Dismantling waste treatment of electrolytic aluminum production enterprises with an annual output of 200,000 tons of aluminum
[0034] (1) Basic information:
[0035] The electrolytic aluminum plant with an annual production capacity of 200,000 tons has been established for 30 years. The dismantling waste of the electrolytic cell is safely landfilled. About 250,000 tons of waste have been piled up, and the average soluble fluorine content is 420mg / L.
[0036] (2) Application method
[0037] Set up 3 cleaning tanks (indicated by A, B, and C in this part), adopt the soaking method, and operate alternately. The specific project is: A is the new charge, and the flow rate of the first-level dissolution is 9m 3 / h, the temperature is 50 degrees; B after the first-stage treatment of leaching slag, the second-stage dissolution, the flow rate is 6m 3 / h, the temperature is 40 degrees; C three-stage dissolution, the flow rate is 6m 3 / h, the temperature is 40 degre...
Embodiment 2
[0043] Example 2 Application of electrolytic aluminum enterprises with an annual output of 600,000 tons
[0044] (1) Basic information
[0045] The electrolytic aluminum plant with an annual production capacity of 600,000 tons has been built and operated for 25 years. The waste from electrolytic cell dismantling is safely landfilled. About 600,000 tons of waste have been stockpiled, and the average soluble fluorine content is 450mg / L;
[0046] Set up 3 cleaning tanks (indicated by A, B, and C in this part), adopt the soaking method, and operate alternately. The specific project is: A is the new charge, and the flow rate of the first-level dissolution is 9m 3 / h, the temperature is 50 degrees; B after the first stage of leaching slag, the second stage of dissolution, the flow rate is 6m 3 / h, the temperature is 40 degrees; C three-stage dissolution, the flow rate is 6m 3 / h, the temperature is 40 degrees and the time is 3 days;
[0047] The product indicators obtained afte...