Assembling method of large steel structure module of nuclear power plant
A technology of structural modules and assembly methods, which is applied in building construction, processing of building materials, construction, etc., can solve the problems of unguaranteed assembly accuracy, high risk of hoisting, and heavy weight of components, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] Embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0070] Taking the assembly method of the three modules CA01, CA20, and CA03 in the AP2000 pressurized water reactor as an example, the specific implementation is described.
[0071] CA01 module assembly: such as image 3 as shown,
[0072] The CA01 module is a complex structure. The module is in the shape of "pin", with the longest dimension of 26.74 meters, the widest width of 28.96 meters, the highest top of 22.86 meters, and the lowest top of 15.92 meters. It is composed of 47 sub-modules.
[0073] Module assembly is carried out from low to high, and the modules are divided into 5 areas, in the order of area 1 (①) → area 2 (②) → area 3 (③) → area 4 (④) → area 5 (⑤). The assembly sequence number of each area is shown in Table 1.
[0074] Table 1 Assembly sequence numbers for each area
[0075]
[0076]
[0077] Installation of other...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com