Combination installation method for steel structure roofing purlins and support bars of industrial factory building
A technology for combined installation of industrial plants, which is applied in the direction of building construction, construction, and building material processing, can solve problems such as installation inconvenience, achieve the effects of improving installation efficiency, ensuring installation quality, and improving labor efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The combined installation method of the steel structure roof purlin and support rod of the industrial plant of the present invention is used for a 30m-span steel structure with a conventional 12m column spacing. After the roof truss beam 3 is installed in place, it is characterized by including the following steps:
[0034] a. Connect the roof purlin 1 and support rod 2 to form an independent hoisting unit
[0035] According to the steel structure roof design of the factory building, it is divided into 5 independent lifting units.
[0036] See now figure 2 , figure 2 It is a structural diagram of an independent hoisting unit with three purlins 1 according to an embodiment of the present invention. As shown in the figure, each independent hoisting unit is made by horizontally connecting and fixing roof purlins 1 and supporting rods 2. Each independent hoisting unit has 3 purlins arranged in parallel and 2 supporting rods 2. The supporting rods are fixedly connected to Betwee...
Embodiment 2
[0043] This embodiment is used in a factory building with a 30m span steel structure and an 18m column spacing. The H-shaped steel length is 6m, and the rest is the same as the first embodiment.
[0044] The present invention has substantive features and significant technological progress. The combined installation method of the steel structure roof purlin and support rod of the industrial plant of the present invention changes the traditional industrial plant steel structure roof purlin and support rod from piece-by-piece hoisting to independent unit integral hoisting , So that the installation and construction process is simple, and the installation work efficiency is doubled.
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com