[0036] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:
[0037] Such as figure 1 As shown, the construction method of the PLC synchronous tensioning of the tied arch bridge of the present invention to replace the suspender comprises the following steps:
[0038] (1) Support engineering
[0039] The construction sites for boom replacement are all on the arch rib top, and the vault is relatively high from the bridge deck, so it is necessary to erect supports, establish aerial construction passages, and platforms to meet the requirements for boom replacement and monitoring. For stand erection see figure 2 , the specific requirements are:
[0040] (1) Determine the pole spacing of the bracket by checking the strength and stability of the bracket.
[0041] (2) Set up supports, scissor braces and horizontal reinforcement bars in strict accordance with the requirements of the code and the distance betwe...