Roadway floor reinforcing system and construction method thereof
A construction method and bottom plate technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., to achieve the effect of increasing stability and saving materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as figure 1 As shown, a roadway floor reinforcement system includes shallow grouting holes 1, middle grouting holes 2 and deep grouting holes 3 on the roadway floor, and the shallow grouting holes 1, middle grouting holes 2 and deep grouting holes The depth of the grouting holes 3 increases successively, and the shallow grouting holes 1, the middle grouting holes 2 and the deep grouting holes 3 are arranged in multiple arrays, and each shallow grouting hole 1, middle grouting hole 2 and deep grouting hole The grouting holes 3 are arranged alternately; the system also includes a grouting hole sealing device 4 for grouting into each grouting hole. The grouting hole sealing device 4 is commonly used safety construction equipment in the field of coal mine production, and mainly includes an expansion capsule and a grouting pipeline that runs through the expansion capsule. The expansion capsule is connected with an expansion pipeline, and the expansion pipeline fills the...
Embodiment 2
[0028] A construction method of the roadway floor reinforcement system, comprising the steps of:
[0029] Step 1: Construct shallow grouting hole 1 on the bottom plate of the roadway, the hole depth is 600mm, and the row spacing: 2000×3000mm.
[0030] Step 2: After the construction of the shallow grouting hole 1 is completed, insert the grouting hole sealing device 4 into the grouting shallow hole, connect the grouting pipe and start grouting. The grouting cement is Portland cement that hardens quickly. Generally, the ratio of 1:1.5 is used, the grout is exposed and then stopped, and the hole is replaced for grouting, and this cycle is repeated until the grout and the shallow surrounding rock are condensed into a layer of curtain 5.
[0031] Step 3: After the shallow grouting hole 1 is grouted to form the curtain 5, the grouting hole 2 is under construction, the hole depth is 1500mm, and the row spacing: 2000×3000mm, forming a five-pattern arrangement with the shallow grouting...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Hole depth | aaaaa | aaaaa |
| Hole depth | aaaaa | aaaaa |
| Depth | aaaaa | aaaaa |