A Data Mining-Based Optimization Method for Order Scheduling of Cascade Hydropower Station Groups
A cascade hydropower station group and command scheduling technology, applied in data processing applications, system integration technology, forecasting, etc., can solve the problems of ignoring the practicability and timeliness of optimization results, unpractical optimization results, and difficult modeling, etc. The effect of class analysis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0049] Most of the existing short-term optimal scheduling methods for cascade hydropower station groups directly use some mathematical optimization method for joint calculation. Not only is the calculation process complicated, especially when dealing with large-scale hydropower system problems, it takes a long time, and the obtained optimization results are often not sufficient. Considering the actual scheduling habits and needs, the usability is poor. How to realize the practicality of the scheduling scheme is the main difficulty of the short-term scheduling of the storage group. The present invention discloses a cascade hydropower station group command scheduling optimization method based on data mining. First, on the basis of fully analyzing and utilizing the power generation characteristics of the hydropower station itself, research on the character...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


