A composite warm-mix flame-retardant anti-skid asphalt tunnel pavement material and its preparation method
A pavement material, anti-slip technology, applied in the field of building materials, can solve the problems of unfavorable maintenance and renovation, small construction depth, poor anti-rutting performance, etc., to eliminate the destructive effect of water stability, improve fire resistance, and increase bonding effect Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A composite warm-mix flame-retardant anti-slip asphalt tunnel pavement material, the preparation method of which comprises the following steps:
[0034] 1) Preparation of functional filler: Mix 69 parts of mineral powder, 18 parts of aluminum hydroxide powder, 5 parts of magnesium hydroxide powder, 3 parts of 4A zeolite powder, and 5 parts of tin oxide powder into a uniform powder to obtain a functional filler;
[0035] 2) Preparation of high-viscosity and high-elasticity modified asphalt: heat 100 parts of AH-70 heavy traffic asphalt to 150°C, perform high-speed shearing and heat up to 170°C within 10 minutes, and add 5 parts of styrene at a constant speed during the heating process - Butadiene-styrene block copolymer and 3 parts of stabilizer (terpene resin); keep the temperature condition of 165 ℃ and continue high-speed shearing for 10 minutes, and add 20 parts of active rubber powder at a uniform speed during this process; then stop shearing And keep it at 145°C fo...
Embodiment 2
[0042] A composite warm-mix flame-retardant anti-slip asphalt tunnel pavement material, the preparation method of which comprises the following steps:
[0043] 1) Preparation of functional filler: Mix 69 parts of mineral powder, 18 parts of aluminum hydroxide powder, 5 parts of magnesium hydroxide powder, 3 parts of 4A zeolite powder, and 5 parts of tin oxide powder into a uniform powder to obtain a functional filler;
[0044] 2) Preparation of high-viscosity and high-elasticity modified asphalt: heat 100 parts of AH-70 heavy traffic asphalt to 150°C, perform high-speed shearing and heat up to 170°C within 10 minutes, and add 5 parts of styrene at a constant speed during the heating process - Butadiene-styrene block copolymer and 3 parts of stabilizer (terpene resin); keep the temperature condition of 165 ℃ and continue high-speed shearing for 10 minutes, and add 20 parts of active rubber powder at a uniform speed during this process; then stop shearing And keep it warm at 145...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com