Method for mounting steel box girders in main tower area of cable-stayed bridge and auxiliary girder erection crane base

A technology of beam erection crane and installation method, applied in bridges, bridge construction, erection/assembly of bridges and other directions, can solve the problems of floating crane lifting height limitation, large floating crane difficulty, large height difference, etc. Good economic and social benefits, simple methods

Inactive Publication Date: 2016-09-07
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The erection scheme has the following limitations: 1. The hoisting of the steel box girder section in the main tower area and the assembly of the girder crane are limited by the height of the floating crane
In canyon and river areas with steep bank slopes, the height difference between the bridge deck and the river bed is very large, often exceeding 100 meters. Basically, there is no floating crane with a lifting height that can meet the needs of steel box girder erection and girder crane assembly; 2. In some areas , limited by navigation conditions, etc., it is difficult for large floating cranes to reach the bridge position
For example, in the upper reaches of the Yangtze River, due to the restrictions of the Three Gorges ship lock, it is difficult for large floating cranes to reach the bridge position through the ship lock
However, in some tidal flat areas along the coast, the water depth is difficult to meet the draft conditions of large floating cranes.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for mounting steel box girders in main tower area of cable-stayed bridge and auxiliary girder erection crane base
  • Method for mounting steel box girders in main tower area of cable-stayed bridge and auxiliary girder erection crane base
  • Method for mounting steel box girders in main tower area of cable-stayed bridge and auxiliary girder erection crane base

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be described in further detail below in conjunction with the embodiments and with reference to the accompanying drawings.

[0037] A method for installing a steel box girder in the main tower area of ​​a cable-stayed bridge, the construction steps are as follows:

[0038] 1. Installation of the first luffing beam crane 6: use the tower crane next to the pier to assemble the supporting bracket 2 of the steel box girder in the main tower area next to the main tower pier 1, and install the slideway beam 3 on the top of the supporting bracket 2 and connect firmly; assemble the beam crane base 4 on the slideway beam 3, and connect the beam crane base 4 and the slideway beam 3 firmly through the anchor device 5; assemble the first beam crane base 4 on the beam crane base 4 The luffing beam erecting crane 6 is anchored on the beam erecting crane base 4 through the beam erecting crane anchor seat 7;

[0039] The installation position of the base 4 of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a method for mounting steel box girders in a main tower area of a cable-stayed bridge. The method for mounting the steel box girders in the main tower area of the cable-stayed bridge comprises the six steps of mounting of a first amplitude variable girder erection crane; mounting and slippage of a first steel box girder segment of the main tower area; hoisting of a second steel box girder segment of the main tower area; dismantling of girder erection crane bases; hoisting of a third steel box girder segment of the main tower area and in-position slippage of the whole steel box girder of the main tower area; and assembly of a second amplitude variable girder erection crane. The method for mounting the steel box girders in the main tower area of the cable-stayed bridge is particularly suitable for the conditions that the altitude difference between a bridge floor and the water surface is large, and a conventional floating crane hoisting scheme is hard to implement, has the advantages of being free of limitations of the hoisting height of floating cranes and the navigation conditions of the floating cranes, is simple and novel, and has good economic benefits and social benefits, and the equipment input is less.

Description

technical field [0001] The invention relates to a bridge construction method, in particular to a new method for installing a steel box girder in the main tower area of ​​a cable-stayed bridge and an auxiliary girder erecting crane base. Background technique [0002] In recent years, my country's economy and society have developed rapidly, and infrastructure construction such as railways and highways has changed with each passing day. The long-span steel box girder cable-stayed bridges spanning rivers, lakes and seas have set off a construction climax. The construction of long-span cable-stayed bridges across rivers, lakes and seas is extremely difficult due to the influence of hydrogeological conditions. Using existing technology to erect long-span cable-stayed bridges across rivers, lakes and seas requires a large investment and high risks. [0003] At present, the construction process of steel box girder cable-stayed bridges is generally as follows: first install the stee...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 宋伟俊陈宁贤龚国锋曲江峰孙长志周朝伟张广涛刘长海高学文刘志章耀林邢如祥霍艳雷裴野王森陈洁
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More