Water pump controller test system address distribution method
A controller testing and distribution method technology, applied in the transmission system, electrical components, etc., can solve the problems that are difficult to implement, and achieve the effect of strong practicability, solving the inconsistency between IP address and location number, and high reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The following further describes the embodiments of the present invention with reference to the drawings:
[0047] The present invention proposes a test system based on the address allocation method of the water pump controller test system, and the structure is as follows figure 1 Shown. It mainly includes upper computer (PC), test cabinet controller, related performance test equipment, water pump controller to be tested and power switch. The upper computer, the test cabinet controller, and the water pump controller to be tested are connected to form a local area network through a communication bus to exchange data. The upper computer mainly realizes that the test process and parameter data are sent to the water pump controller to be tested and the test report and corresponding database of the water pump controller to be tested are generated. The test cabinet controller mainly realizes the address setting of the water pump controller under test, the control of the correspo...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com