A stress-absorbing layer anti-cracking material mixed with coal gasification fine slag and its preparation method
A stress absorbing layer and coal gasification technology, which is applied in the field of asphalt pavement material preparation, can solve the problems of difficult construction, high cost, dependence on imported modified raw materials, etc., and achieves the effect of a simple preparation method.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] The preparation of the anti-cracking material of the stress absorbing layer mixed with coal gasification fine slag comprises the following steps:
[0041] Step 1, weighing 20 parts of coal gasification fine slag, 20 parts of 0-3mm stone chips, 50 parts of 3-5mm gravel, and 10 parts of SBS modified asphalt;
[0042] Step 2, heating the 0-3mm stone chips and 3-5mm gravel at a constant temperature of 180-190°C for 4 hours, and set aside;
[0043] Step 3, heating the coal gasification fine slag at a temperature of 150-160°C for 3 hours at a constant temperature, and set aside;
[0044] Step 4, heating the SBS-modified asphalt to 170-180°C, and fully stirring evenly, and set aside;
[0045] Step 5: Put 0-3mm stone chips, 3-5mm gravel and coal gasification fine slag heated at constant temperature in the asphalt mixing pot, dry mix for 15s, add heated SBS modified asphalt, wet mix for 90s, Instantly.
Embodiment 2
[0047] The preparation of the anti-cracking material of the stress absorbing layer mixed with coal gasification fine slag comprises the following steps:
[0048] Step 1, weighing 23 parts of coal gasification fine slag, 18 parts of 0-3mm stone chips, 48 parts of 3-5mm gravel, 10.8 parts of SBS modified asphalt, and 0.2 part of brucite mineral fiber;
[0049] Step 2, heating the 0-3mm stone chips and 3-5mm gravel at a constant temperature of 180-190°C for 4 hours, and set aside;
[0050] Step 3, heating the coal gasification fine slag at a temperature of 150-160°C for 2 hours at a constant temperature, and set aside;
[0051] Step 4, heating the SBS-modified asphalt to 170-180°C, and fully stirring evenly, and set aside;
[0052] Step 5: Put 0-3mm stone chips, 3-5mm gravel and coal gasification fine slag heated at constant temperature in the asphalt mixture mixing pot, dry mix for 15s, then add brucite mineral fiber, dry mix for 5s, and then Add heated SBS modified asphalt,...
Embodiment 3
[0054] The preparation of the anti-cracking material of the stress absorbing layer mixed with coal gasification fine slag comprises the following steps:
[0055]Step 1, weighing 26 parts of coal gasification fine slag, 16 parts of 0-3mm stone chips, 46 parts of 3-5mm gravel, 11.8 parts of SBS modified asphalt, and 0.2 part of brucite mineral fiber;
[0056] Step 2, heating the 0-3mm stone chips and 3-5mm gravel at a constant temperature of 180-190°C for 4 hours, and set aside;
[0057] Step 3, heating the coal gasification fine slag at a temperature of 150-160°C for 2 hours at a constant temperature, and set aside;
[0058] Step 4, heating the SBS-modified asphalt to 170-180°C, and fully stirring evenly, and set aside;
[0059] Step 5: Put 0-3mm stone chips, 3-5mm gravel and coal gasification fine slag heated at constant temperature in the asphalt mixture mixing pot, dry mix for 15s, then add brucite mineral fiber, dry mix for 5s, and then Add heated SBS modified asphalt, we...
PUM
Property | Measurement | Unit |
---|---|---|
particle size | aaaaa | aaaaa |
particle size | aaaaa | aaaaa |
density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com