Control method and system for copper electrolysis bridge cranes
A control method and control system technology, applied in the control method and system field of copper electrolysis bridge crane, can solve the problems of frequent operation, low safety, high work intensity and pressure, etc., to ensure orderliness and improve The effect of the level of automation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] The electrolysis cycle of cathode and anode plates in the copper electrolysis workshop is fixed. At the end of the cycle, the special bridge crane for copper electrolysis must quickly complete the renewal of the electrolytic cell plate, and mainly runs back and forth between the ground unit area and the electrolytic cell area. In the embodiment of the present invention, firstly, the working mode, load type, operation mode and operation type of the bridge crane dedicated to copper electrolysis are planned according to the process flow of copper electrolysis.
[0027] Optionally, the embodiment of the present invention divides the working mode, load type, operation mode, and operation type as follows:
[0028] Working modes include manual and automatic modes;
[0029] The load type can include three types of cathode, anode 56 and anode 58 depending on the specific situation. The specific structure of the sling will have different actions depending on the load type. Among ...
Embodiment 2
[0057] Corresponding to the above method embodiments, this embodiment also discloses a control system for a copper electrolysis bridge crane, which is characterized in that it includes:
[0058] The first module is used to obtain the target task, and automatically provides the target positions of the cart and the trolley respectively corresponding to the target task;
[0059] The second module is used to obtain the current positions of the cart and the trolley respectively after the current task ends;
[0060] The third module is used to search for the corresponding operation route from the planned path according to the respective target positions and current positions of the cart and the trolley, and according to the operation route and the corresponding working mode, load type, working mode and operation of the target task The type controls the bridge crane, the control includes the linkage of large and small vehicles, the control of the spreader and the liquid receiving pla...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


