A rapid and waste-water technology, applied in chemical instruments and methods, biological water/sewage treatment, water/sludge/sewage treatment, etc., can solve problems such as the difficulty of film formation in unknown water bodies, and achieve shortened film formation time, high efficiency, and Choose a quick effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] The effluent quality of a certain industrial wastewater cannot meet the requirements of Class 1 (A). It is planned to use the biofilm method to upgrade the original aerobic tank.
[0065] The specific implementation process of this example is:
[0066] 1) Sampling the target film-coated mud-water mixture and homogenize with a homogenizer; the number of homogenization is 15 times.
[0067] 2) Filter the fully homogenized mud-water mixture with a 10 micron filter membrane and take the filtrate;
[0068] 3) Divide the filtrate into two parts, one part of the filtrate is labeled as filtrate A; the other part of the filtrate is filtered through another 0.22 micron filter membrane and then the filtrate is taken, labeled as filtrate B, which is the reference solution of filtrate A;
[0069] 4) Fix the No. 1 diaphragm 3 in the film formation monitoring cabin 4;
[0070] 5) The combination of fast matching wastewater and filler film-hanging device is completed;
[0071] 6) Feed the filtrate...
Embodiment 2
[0077] The effluent quality of a certain industrial wastewater cannot meet the requirements of Class 1 (A). It is planned to use the biofilm method to upgrade the original aerobic tank.
[0078] The specific implementation process of this example is:
[0079] 1) Sampling the target film-hanging mud-water mixture, homogenize with a homogenizer; the number of homogenization is 10 times.
[0080] 2) Filter the fully homogenized mud-water mixture with an 8 micron filter membrane and take the filtrate;
[0081] 3) Divide the filtrate into two parts, one part of the filtrate is labeled as filtrate A; the other part of the filtrate is filtered through another layer of 0.45 micron filter membrane and then the filtrate is taken, labeled as filtrate B, which is the reference solution of filtrate A;
[0082] 4) Fix the No. 1 diaphragm 3 in the film formation monitoring cabin 4;
[0083] 5) The combination of fast matching wastewater and filler film-hanging device is completed;
[0084] 6) Feed the f...
Embodiment 3
[0090] The effluent quality of a certain industrial wastewater cannot meet the requirements of Class 1 (A). It is planned to use the biofilm method to upgrade the original aerobic tank.
[0091] The specific implementation process of this example is:
[0092] 1) Sampling the target film-coated mud-water mixture and homogenize with a homogenizer; the number of homogenization is 12 times.
[0093] 2) Filter the fully homogenized mud-water mixture with a 9 micron filter membrane and take the filtrate;
[0094] 3) Divide the filtrate into two parts, one part of the filtrate is labeled as filtrate A; the other part of the filtrate is filtered through another layer of 0.3 micron filter membrane and then the filtrate is taken, labeled as filtrate B, which is the reference solution of filtrate A;
[0095] 4) Fix the No. 1 diaphragm 3 in the film formation monitoring cabin 4;
[0096] 5) The combination of fast matching wastewater and filler film-hanging device is completed;
[0097] 6) Feed the f...