Construction method for stand column and cover beam assembled structure

A construction method and column technology, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problems of large impact on the surrounding environment, many on-site procedures, and high basic requirements, so as to ensure safe operation, good component quality, and reduce labor intensity. Effect

Inactive Publication Date: 2017-02-15
SHANGHAI MUNICIPAL ENG DESIGN INST GRP +1
View PDF4 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The disadvantages are that the construction period is long, there are many on-site procedures, the requirements for the site are high, the suppor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for stand column and cover beam assembled structure
  • Construction method for stand column and cover beam assembled structure
  • Construction method for stand column and cover beam assembled structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to make the above objects, features and advantages of the present invention more comprehensible, specific implementations of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be noted that all the drawings of the present invention are in simplified form and use inaccurate scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.

[0031] The construction method of column and cover beam assembly structure provided by the present invention, such as Figure 1 to Figure 5c As shown, the splicing of the column 10 and the cover beam 20 specifically includes the following steps:

[0032] S1: Prefabricated columns 10, such as Figure 5a As shown, and pre-embed steel bars 11 in the column 10, install the slurry ring 42 on the steel bars 11; prefabricate the cover beam 20, and reserve the metal bellows 21 (metal bellows) in the cover beam...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Thicknessaaaaaaaaaa
Diameteraaaaaaaaaa
Login to view more

Abstract

The invention relates to a construction method for a stand column and cover beam assembled structure. The construction method includes the following steps that S1, a stand column is prefabricated, rebars are embedded in the stand column in advance; a cover beam is prefabricated, metal bellows are reserved in the cover beam, and a mortar pressing channel is formed in the cover beam; and the spliced face of the stand column and the cover beam is cleaned and measured; S2, pre-assembling is performed, hole channels of the metal bellows are aligned with the rebars to be sleeved in, and after the perpendicularity and the elevation of the cover beam are adjusted, the cover beam is lifted up; and S3, high-strength mortar is laid in a splicing seam between the stand column and the cover beam, then the cover beam drops down, and after the high-strength mortar reaches the strength requirement, the high-strength mortar is pressed in from the mortar pressing channel till mortar pressing ends. According to the construction method, a traditional bridge building manner is changed, no supports and no formworks exist on the construction site, the on-site construction period is shortened, the labor intensity of workers is relieved, and the requirement for the construction site is lowered; the work procedures of on-site support foundation treatment and support formwork erecting are omitted, and the economical efficiency is high; and meanwhile the negative effects on the ambient environment are reduced.

Description

technical field [0001] The invention relates to the field of bridge structure construction, in particular to a construction method for an assembled structure of a column and a cover beam. Background technique [0002] At present, the connection between the bridge cover beam and the column is usually cast in-situ by the bracket method, that is, the bracket and the formwork are erected, and the column reinforcement is bound on the cap platform. After the concrete pouring and curing of the column is completed, the cover beam reinforcement is bound, and then the cover beam concrete is poured , Generally, a construction period is at least 2 to 3 weeks. [0003] The disadvantages are that the construction period is long, there are many on-site procedures, the requirements for the site are high, the support system has high requirements for the foundation, the safety is poor, the pollution is serious, and it has a great impact on the surrounding environment. Contents of the invent...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D21/00E01D19/02
CPCE01D19/02E01D21/00
Inventor 卢永成刘经熠冀振龙崔晨沈维芳朱世峰
Owner SHANGHAI MUNICIPAL ENG DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products