Construction method during beam penetrating of spool
A construction method and line pipe technology, which are applied in the fields of formwork/formwork/work frame, on-site preparation of building components, construction, etc., to achieve the effect of reducing hidden dangers, reducing quality defects, and improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The core of the present invention is to provide a construction method for wire pipes passing through beams, which effectively solves the construction quality defects and improves the construction efficiency of electromechanical installation.
[0022] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0023] Please refer to figure 1 and figure 2 , figure 1 It is a schematic diagram of the pre-embedding stage of the construction method when the wire pipe passes through the beam provided by a specific embodime...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com