Simultaneous operation method for fine adjustment of two tracks of high-speed rail
A high-speed railway, fine-tuning technology, applied to roads, tracks, laying tracks, etc., can solve problems such as low construction efficiency and inability to meet skylight points, and achieve high operational stability, high efficiency, and good flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Such as Figure 1 to Figure 2 Shown, this specific embodiment adopts following technical scheme: it comprises the following steps:
[0027] 1. Before the on-line operation, you must arrive at the designated crossing half an hour before the skylight time, and arrange all the tools and materials in a suitable position for the protection personnel of the equipment management unit to take pictures. All personnel must wear protective clothing, and all tools must have reflective signs pasted in conspicuous positions. Enter the operation section in an orderly manner after the approval of the skylight point;
[0028] 2. The tools and materials must be stacked neatly and orderly on the flat trolley to prevent falling and facilitate distribution.
[0029] 3. Use a 0-level rail detector to test the line before operation;
[0030] 4. After traveling to the operation mileage, the plan labeling personnel accurately mark the adjustment amount on the agreed position of the route in ...
PUM
Login to View More Abstract