The integral forming construction method of inter-column tie beam and pier column and the formwork support used

A construction method and integral forming technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as increased project costs, wrong platform, slurry leakage, and impact on project progress, so as to speed up construction progress and ensure construction quality , beautiful appearance effect

Active Publication Date: 2018-10-30
SHANXI ROAD & BRIDGE NO 2 ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The progress of the project is affected;
[0005] 2. Increase in engineering costs;
[0006] 3. The stubble between the upper pier column and the lower pier column is prone to misalignment and slurry leakage
This method also has the same shortcomings as the hoop method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The integral forming construction method of inter-column tie beam and pier column and the formwork support used
  • The integral forming construction method of inter-column tie beam and pier column and the formwork support used
  • The integral forming construction method of inter-column tie beam and pier column and the formwork support used

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] Such as Figure 1-Figure 7 As shown, the inter-column tie beam and pier column integral formwork support of the present invention includes a pier column formwork 1, an inter-column tie beam formwork 2, a diagonal brace 3 and a tie rod 4, and the inter-column tie beam formwork 2 is fixed on two piers Between the column formwork 1, bolt holes are provided in the middle of the bottom surface of the bottom formwork in the inter-column tie beam formwork 2, bolt holes are also provided on the two pier column formwork 1, and the upper ends of the two diagonal braces 3 are connected between the columns by bolts Tie the middle part of the bottom surface of the beam formwork 2, the two diagonal braces 3 are arranged symmetrically at an angle of 45°, the lower ends of the two diagonal braces 3 are respectively connected with a pier formwork 1 by bolts, and the tie rods 4 It is horizontally arranged between two pier formworks 1, and is connected with the pier formwork 1 by bolts; t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an inter-stud straining beam and pier stud overall formation construction method and a mold plate bracket used in the method, belongs to the technical field of road bridge pier stud and inter-stud straining beam construction methods, and aims to provide a construction method that an inter-stud straining beam, an upper pier stud and a lower pier stud are formed as a whole through one time of casting, and a mold plate bracket used in the construction method. According to the technical scheme, the inter-stud straining beam and pier stud overall formation construction method comprises the following steps: 1, mounting pier stud reinforcing steel bars; 2, binding reinforcing steel bars of the inter-stud straining beam, erecting mold plates, and casting concrete; 3, performing one-time mounting of mold plates of the upper pier stud, the lower pier stud and the inter-stud straining beam; 4, performing overall casting of concrete of the upper pier stud, the lower pier stud and the inter-stud straining beam; and 5, disassembling the mold plates of the upper pier stud, the inter-stud straining beam and the lower pier stud, wherein the inter-stud straining beam and the pier studs are wholly formed as the mold plate bracket, upper ends of two inclined support rods are connected in the middle of the bottom surface of the bottom mold of the mold plate of the inter-stud straining beam, lower ends of the two inclined support rods are respectively connected with one pier stud mold plate, and a transverse pull rod is horizontally arranged between two pier stud mold plates.

Description

technical field [0001] The invention discloses a construction method for integrally forming inter-column tie beams and pier columns and a template support used therein, and belongs to the technical field of construction methods for highway bridge pier columns and inter-column tie beams. Background technique [0002] In recent years, with the continuous construction of various grades of highways, highway bridges have also been widely used. At present, in the design of highway bridges, most of the bridge piers with a lower height of less than 30m are designed as column piers, which generally consist of caps (inter-pile tie beams) on pile foundations, column pier bodies, and inter-column tie beams (pier column Higher) and cover beams. The advantage is that it can reduce the weight of the pier body, save masonry materials, is more beautiful, has greater rigidity and strength, and can be used in rivers with drifting objects and drift ice. In the construction of the lower part o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 程高峰席晓彬黄亮
Owner SHANXI ROAD & BRIDGE NO 2 ENG CO LTD