A metal plate derusting equipment
A hardware board and equipment technology, applied in metal processing equipment, grinding/polishing equipment, grinding skateboards, etc., can solve the problems of not achieving the desired effect, easy to pollute the environment, time-consuming and labor-intensive, etc., to save manpower and have no pollution to the environment , good cleaning effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A metal plate derusting equipment, such as Figure 1-3 As shown, it includes a fixed frame 1, a first rack 2, a first bearing seat 3, a first rotating shaft 4, a first gear 5, a first pulley 6, a connecting belt 7, a second bearing seat 8, and a second rotating shaft 9 , second pulley 10, second rack 11, second gear 12, slide rail 13, slider 14, tank body 15, first derusting block 16, first guide rail 17, first connecting rod 18, first lift Rod 19, cam 20, motor 21, second connecting rod 22, second elevating rod 23, second guide rail 24, second derusting block 25, first spring 26 and first pull rod 27, fixed frame 1 from top to bottom Motor 21, the first connecting rod 18, the first guide rail 17, the first bearing seat 3, the second bearing seat 8 and the slide rail 13 are arranged successively, the first connecting rod 18 is connected with the fixed frame 1 in rotation, and the motor 21 is provided with There is a cam 20, the left end of the first connecting rod 18 i...
Embodiment 2
[0028] A metal plate derusting equipment, such as Figure 1-3As shown, it includes a fixed frame 1, a first rack 2, a first bearing seat 3, a first rotating shaft 4, a first gear 5, a first pulley 6, a connecting belt 7, a second bearing seat 8, and a second rotating shaft 9 , second pulley 10, second rack 11, second gear 12, slide rail 13, slider 14, tank body 15, first derusting block 16, first guide rail 17, first connecting rod 18, first lift Rod 19, cam 20, motor 21, second connecting rod 22, second elevating rod 23, second guide rail 24, second derusting block 25, first spring 26 and first pull rod 27, fixed frame 1 from top to bottom Motor 21, the first connecting rod 18, the first guide rail 17, the first bearing seat 3, the second bearing seat 8 and the slide rail 13 are arranged successively, the first connecting rod 18 is connected with the fixed frame 1 in rotation, and the motor 21 is provided with There is a cam 20, the left end of the first connecting rod 18 is...
Embodiment 3
[0031] A metal plate derusting equipment, such as Figure 1-3 As shown, it includes a fixed frame 1, a first rack 2, a first bearing seat 3, a first rotating shaft 4, a first gear 5, a first pulley 6, a connecting belt 7, a second bearing seat 8, and a second rotating shaft 9 , second pulley 10, second rack 11, second gear 12, slide rail 13, slider 14, tank body 15, first derusting block 16, first guide rail 17, first connecting rod 18, first lift Rod 19, cam 20, motor 21, second connecting rod 22, second elevating rod 23, second guide rail 24, second derusting block 25, first spring 26 and first pull rod 27, fixed frame 1 from top to bottom Motor 21, the first connecting rod 18, the first guide rail 17, the first bearing seat 3, the second bearing seat 8 and the slide rail 13 are arranged successively, the first connecting rod 18 is connected with the fixed frame 1 in rotation, and the motor 21 is provided with There is a cam 20, the left end of the first connecting rod 18 i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


