A method for reinforcing a bridge erecting machine
A bridge erection machine and longitudinal reinforcement technology, applied in the direction of bridge reinforcement, bridge, bridge construction, etc., can solve the problems of uneven, unstable bridge erection machine stress, easy to break, etc., to facilitate construction, improve strength, reduce load Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0030] Taking the existing 320t / 60m large-tonnage highway bridge erecting machine as an example, when the beam body is dismantled, the reinforcement method includes the following steps:
[0031] Step A: Measure the length, diameter, and transverse span of the front outrigger 1 of the bridge erecting machine, measure the diameter of the pier column 5 where the bridge erection machine is located, and the distance between the pier column 5 and the front outrigger 1 . Use relevant measuring equipment to measure the on-site parameters for subsequent calculations and steel selection. Take...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com