GPS drilling machine drill and construction method for hole forming of pile foundation through GPS drilling machine
A drilling rig and drill bit technology, which is used in infrastructure engineering, sheet pile walls, buildings, etc., can solve problems such as obstacles cannot be drilled, drill bits and drill pipes are broken, and hole-forming construction operations cannot be performed, so as to improve operation efficiency, The effect of uniform force and prevention of breakage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] combine figure 1 As shown, a GPS drilling rig drill bit is preferably used to assemble on a GPS-20 type drilling rig. It includes a drill rod 1, the peripheral surface of the lower end of the drill rod is fixed to a hollow cylindrical drill barrel 3 through a drill bit support body 2, the bottom end of the drill rod is flush with the drill barrel or extends out of the drill barrel, and the drill barrel The bottom of the drill rod and the bottom of the drill rod are fixed with some diamond drill teeth 4, and the number of drill teeth at the bottom of the drill rod is preferably 4. As a preferred solution, the drill rod support body is composed of several support rods fixed between the drill barrel and the drill rod. The number of the support rods is 3 or 4, and the included angles between adjacent support rods are equal. According to construction requirements, the length of the drilling barrel is 0.5m to 1.2m. The diameter of the drill barrel is 3 to 5 times the diame...
Embodiment 2
[0034] The difference between this embodiment and Embodiment 1 is that the bottom of the drill bit support body is also fixed with drill teeth, which is beneficial to speed up grinding through the reinforced soil and improve the working efficiency.
[0035] The working principle of the present invention is that the drill teeth are fixed at the bottom of the drill pipe and the drill barrel at the same time. During the construction operation, the drill teeth on the drill barrel and the drill teeth on the drill pipe work together to share the force and make it easier to grind. Through the reinforced soil, it is not easy to break the drill bit and drill pipe. When the bottom end of the drill pipe extends out of the drilling barrel, the drill pipe first touches the working surface during the rotating operation, and the reinforced soil on the working surface is broken from the drill pipe point, and then the drilling barrel touches the working surface, relying on the drill teeth on th...