Building method and apparatus of architectural structure
A construction method and building technology, applied in building construction, building material processing, construction, etc., can solve the problems of inconvenient installation and movement of equipment, large size of printing equipment, slow printing speed, etc., and achieve convenient movement and installation. Fast, reduce follow-up workload, reduce the effect of workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Please refer to figure 1 and figure 2 , this embodiment provides a building construction device 1000 . The construction device 1000 includes a control device (not shown in the figure), a construction robot, and a construction device. The construction device is located in the construction robot.
[0039] In this embodiment, the construction robot is an execution robot 100 that is configured to be attached to a wall 300 and walk, and there are multiple execution robots 100 . Each execution robot 100 is provided with a construction device for performing building construction. The construction device of each execution robot 100 includes a printing head 200, and the above-mentioned multiple execution robots 100 are all used for additive printing.
[0040] The execution robots 100 are all communicated with the control device. The control device is used to control the execution robot 100 to move along a preset trajectory, so that the execution robot 100 can perform addit...
Embodiment 2
[0085] Please refer to image 3 and Figure 4 , this embodiment provides a construction device 2000 for a building. The difference between the construction device 2000 and the construction device 1000 is that the construction robot of the construction device 2000 also includes a connecting piece 2100 for connecting the execution robot 2300 .
[0086] In this embodiment, the connecting piece 2100 is U-shaped, and the connecting piece 2100 is connected between two execution robots 2300 , and the two execution robots 2300 are located at opposite ends of the connecting piece 2100 . The running wheels 2310 of the two execution robots 100 are both set towards the side where the U-shaped opening of the connecting piece 2100 is located, constituting the execution robot group 2200 .
[0087] The construction device is arranged on the connecting part 2100 of the execution robot group 2200 and is located between the two execution robots 2300 . In this embodiment, the construction devic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com