Unlock instant, AI-driven research and patent intelligence for your innovation.

Prefabricated assembly type heat insulation greenhouse wall body

A technology of prefabricated assembly and thermal insulation greenhouses, which can be applied to walls, greenhouse cultivation, and climate change adaptation. It can solve problems such as high construction labor intensity, poor structural stability, and poor thermal insulation effects, and achieve good thermal insulation effects, improve efficiency, and improve construction. efficiency effect

Pending Publication Date: 2017-10-17
程力
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of greenhouse planting technology, the production efficiency has been continuously improved, and the greenhouse technology has been widely used in agricultural production activities. Its basic structure is composed of the main body of the greenhouse covered with thermal insulation film. Wall construction is time-consuming and labor-

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated assembly type heat insulation greenhouse wall body
  • Prefabricated assembly type heat insulation greenhouse wall body
  • Prefabricated assembly type heat insulation greenhouse wall body

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] The following is a description of Embodiment 1.

[0030] Such as Figure 1 to Figure 9 As shown, a prefabricated assembly type thermal insulation greenhouse wall, including wall thermal insulation material 1, local thermal insulation layer 2, main frame 3, supporting steel frame 4, hoisting ring 5, steel frame wall top embedded parts 6, steel frame foundation Embedded parts 7, steel bar connecting rod 8, pick plate 9, wall foundation 10, corner steel bar hole 11, stable base 12, thermal insulation material protection layer 13, main body vertical plate 14, adjacent steel bar hole 15, gable wall 16, gable wall insulation Material 17, stabilizer bar 18, the main frame 3 includes a straight frame 31 and a corner frame 32, and a plurality of steel bar connecting rods 8 and a plurality of adjacent steel bar holes 15 are evenly arranged on both sides of the straight frame 31 The bottoms on both sides of the straight frame 31 are respectively provided with a stable base 12, an...

Embodiment 2

[0034] The following is a description of Embodiment 2.

[0035]In Embodiment 2, the same symbols are assigned to the same structures as in the above-mentioned embodiments, and the same descriptions are omitted. Embodiment 2 is improved on the basis of Embodiment 1, and the main body vertical plate 14 is replaced by a combination of keel and thermal insulation composite board.

[0036] It can effectively improve the thermal insulation performance and enhance the practicability.

Embodiment 3

[0038] The following is a description of Embodiment 3.

[0039] In Embodiment 3, the same symbols are assigned to the same structures as those in the above-mentioned Embodiments, and the same descriptions are omitted. Embodiment 3 is improved on the basis of Embodiment 1, and railing embedded parts 19 are arranged on the upper and outer sides of the pick-up plate 9, and protective railings 20 are installed on the railing embedded parts 19.

[0040] When the staff walks on the pick plate 9, the safety is effectively improved.

[0041] The device is pre-finished in the prefabricated component factory using precise mold flow processing. First, the hoisting ring 5, the embedded part 6 of the steel frame wall top, the embedded part 19 of the railing, and the parts used for pouring the main frame 3 and its subsidiary structures The steel bar frame is bound and fixed in advance, and the thermal insulation material protection layer 13 fixed with tie rods is placed in the mould, which...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a prefabricated assembly type heat insulation greenhouse wall body, and belongs to the technical field of agricultural production. The prefabricated assembly type heat insulation greenhouse wall body comprises a main body framework, a support steel frame and corner steel bar holes, wherein the main body framework comprises a flat and straight framework and a corner framework; steel bar connecting rods and adjacent steel bar holes are arranged at the two sides of the flat and straight framework; stabilization bases are also respectively arranged at the bottoms of the two sides of the flat and straight framework; the corner framework comprises a first corner framework and a second corner frame which are adjacent in the corner position; the corner steel bar holes are formed in one side of the front end surface of the first corner framework; the second corner framework is matched and installed with the corner steel bar holes through steel bar connecting rods arranged at the end surface of one side; the first corner framework is matched and installed with the adjacent steel bar holes formed in the flat and straight framework through the steel bar connecting rods; the second corner framework is matched and installed with the steel bar connecting rods arranged on the flat and straight framework through the adjacent steel bar holes; a main body vertical plate is arranged inside the main body framework; and a steel frame wall top embedded element is arranged on the top of the main body framework. The problem of poor heat insulation effect of the existing greenhouse wall body is solved; the structure is safe and stable; the heat insulation effect is good; and the practicability is enhanced.

Description

technical field [0001] The invention relates to a wall body of a prefabricated and assembled thermal insulation greenhouse, which belongs to the technical field of agricultural production. Background technique [0002] With the development of greenhouse planting technology, the production efficiency has been continuously improved, and the greenhouse technology has been widely used in agricultural production activities. Its basic structure is composed of the main body of the greenhouse covered with thermal insulation film. Wall construction is time-consuming and labor-intensive. At the same time, when using earth walls to build the main body of the greenhouse, a certain distance needs to be kept between the large sheds to prevent chain collapse caused by insufficient earth wall strength, which occupies a large area. There are disadvantages such as poor effect, poor structural stability, high construction labor intensity and high cost. [0003] In order to effectively solve t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/00A01G9/16
CPCA01G9/16E04B2/00Y02A40/25
Inventor 程力
Owner 程力