Shuffled frog leaping-path reconnection-based production transportation co-scheduling method and system
A hybrid leapfrog algorithm and collaborative scheduling technology, applied in the field of supply chain, can solve problems such as complexity and inability to adapt to production requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present disclosure with reference to the accompanying drawings in the embodiments of the present disclosure. Apparently, the described embodiments are only some of the embodiments of the present disclosure, not all of them. Based on the embodiments in the present disclosure, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present disclosure.
[0037] like figure 1 and figure 2 As shown, the production and transportation collaborative scheduling problem is modeled for the difference in workpiece size, production time, workpiece arrival time and transportation time on different transportation routes, and then solved by a hybrid leapfrog algorithm and path reconnection algorithm, so that Obtain a set of optimization schemes for transportation and production scheduling, so as to gr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com