Method for accurately controlling pile top elevation of CFG pile
A precise control and elevation technology, applied in soil protection, foundation structure engineering, foundation structure testing, etc., can solve the problems of secondary cutting, too long pile head, insufficient pile length, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:
[0020] As shown in accompanying drawing, a kind of method for accurately controlling CFG pile top elevation, it comprises the steps:
[0021] Step 1: On-site data collection: According to the design requirements, data is collected on the site ground and the CFG pile driver. The collected data mainly includes the ground elevation, the length of the CFG drill pipe, and the inner diameter of the CFG drill pipe;
[0022] Step 2: Air Drilling Data Calculation: According to the pile diameter, effective pile length and pile bottom elevation provided by the design, process the data collected on site to determine the depth S of the drill bit from the ground during empty drilling. The depth S of the drill bit from the ground is based on the formula D / X=(S-L+0.5) is calculated, wherein, D is the stop supply height of the concrete in the drill pipe, and X is the con...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 