Optimum Design Method for Stiffness and Construction Timing of Secondary Lining Structure of Tunnel with Weak Rheological Surrounding Rock
A technology of secondary lining and structural rigidity, applied in the direction of tunnel lining, tunnel, shaft lining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further elaborated and illustrated below in conjunction with the accompanying drawings and specific embodiments.
[0026] Combined with the engineering practice of a rheological soft rock tunnel in a mountainous area, the structure of the secondary lining is optimally designed. Based on the calculation, operation and implementation of the above research results, the specific implementation of this method is made in this section as follows.
[0027]The tunnel has a gross width of 18.66m and a gross height of 12.71m. The entrance and exit are loose and broken rocks, shallow buried tunnel sections, and the fault fracture zone and joint-intensive zone in the cave are all excavated using the optimized CRD construction method. The excavation sequence is as follows: the upper half section of the left pilot pit - the upper half section of the right pilot pit - the lower half section of the left pilot pit - the lower half section of the right pilot ...