Cement deblocking device for building monitoring
A technology for deblocking and cementing, which is applied in the direction of solid separation, sieve, grid, etc., and can solve the problems of short deblocking time and long deblocking time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A building monitoring cement deblocking equipment, such as Figure 1-5 As shown, it includes a deblocking box 1, a baffle plate 2, a deblocking mechanism 3 and a dredging mechanism 4. The top of the deblocking box 1 is connected with a deblocking mechanism 3, and the lower part of the deblocking box 1 is connected with a dredging mechanism 4, and the deblocking box 1 is connected with a dredging mechanism 4. The bottom end of the left wall of 1 is rotatably connected with a baffle plate 2, and the right side of the bottom of the baffle plate 2 is fixed on the right wall of the deblocking box 1 by means of bolt connection.
Embodiment 2
[0035] A building monitoring cement deblocking equipment, such as Figure 1-5 As shown, it includes a deblocking box 1, a baffle plate 2, a deblocking mechanism 3 and a dredging mechanism 4. The top of the deblocking box 1 is connected with a deblocking mechanism 3, and the lower part of the deblocking box 1 is connected with a dredging mechanism 4, and the deblocking box 1 is connected with a dredging mechanism 4. The bottom end of the left wall of 1 is rotatably connected with a baffle plate 2, and the right side of the bottom of the baffle plate 2 is fixed on the right wall of the deblocking box 1 by means of bolt connection.
[0036] The deblocking mechanism 3 includes the first bearing seat 31, the first rotating rod 32, the deblocking lever 33, the stirring rod 34, the connecting rod 35 and the motor 36, the deblocking box 1 left upper part is connected with the motor 36, and the deblocking box 1 The left and right two wall tops are all connected with the first bearing s...
Embodiment 3
[0038] A building monitoring cement deblocking equipment, such as Figure 1-5 As shown, it includes a deblocking box 1, a baffle plate 2, a deblocking mechanism 3 and a dredging mechanism 4. The top of the deblocking box 1 is connected with a deblocking mechanism 3, and the lower part of the deblocking box 1 is connected with a dredging mechanism 4, and the deblocking box 1 is connected with a dredging mechanism 4. The bottom end of the left wall of 1 is rotatably connected with a baffle plate 2, and the right side of the bottom of the baffle plate 2 is fixed on the right wall of the deblocking box 1 by means of bolt connection.
[0039] The deblocking mechanism 3 includes the first bearing seat 31, the first rotating rod 32, the deblocking lever 33, the stirring rod 34, the connecting rod 35 and the motor 36, the deblocking box 1 left upper part is connected with the motor 36, and the deblocking box 1 The left and right two wall tops are all connected with the first bearing s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com